Don't worry, just assess: Eight tips for reducing
go-live
stress

06.07.17

We all know them. In fact, you might be one of them — people who worry the words “go live” will lead to job loss (theirs). This feeling is not entirely irrational. When an organization is ready to go live from an existing legacy system to a new enterprise system, stress levels rise and doubts emerge: What can go wrong? How much time will be lost? Are we really ready for this?

We’re here to help. Here is a list of go-live essentials to help you mitigate stress and assess your readiness. While not all-encompassing, it’s a good place to start. Here’s what you need:

  1. A detailed project plan which specifies all of the implementation tasks
    A project plan is one of the most important parts of an implementation. A detailed plan that identifies all of the implementation tasks along with an assigned resource for each task is critical to success. The implementation vendor and the organization should develop this plan together to get buy-in from both teams.
  1. A completed system configuration
    New system configuration is one of the most time-consuming aspects of a technology implementation. If you don’t complete the implementation in a timely manner, it will impact your go-live date. Configure the new system based upon the best practices of the system — not how the existing system was — for timely implementation.
  1. External system interface identification
    While replacement of some external systems may be a goal of an implementation, there may be situations where external systems are not replaced or the organization has to send and/or receive data from external organizations. And while new systems have advanced interface technology capabilities, the external systems may not share these capabilities. Therefore it is imperative that you identify external system interfaces to avoid gaps in functionality.
  1. Testing, testing, testing
    End-to-end testing or User Acceptance Testing (UAT) is often overlooked. It involves completing testing scenarios for each module to ensure appropriate system configuration. While the timing of UAT may vary, allow adequate time to identify solutions to issues that may result from UAT.
  1. Data conversion validation
    When you begin using a new system, it’s best to ensure you’re working with clean, up-to-date data. Identify data conversion tasks in the project plan and include multiple data conversion passes. You must also determine if the existing data is actually worth converting. When you complete the data conversion, check for accuracy.
  1. End user training
    You must train all end users to ensure proper utilization across the organization. Don’t underestimate the amount of time needed for end user training. It is also important to provide a feedback mechanism for end users to determine if the training was successful.
  1. A go-live cutover plan
    The overall project plan may indicate go-live as an activity. List specific activities to complete as part of go-live. You can build these tasks into the project plan or maintain them as a separate checklist to promote a smooth transition.
  1. Support structure
    Establish an internal support structure when preparing for go-live to help address issues that may arise. Most organizations take time to configure and test the system and provide training to end users prior to go-live. Questions will arise as part of this process — establish a process to track and address these questions.

Technology implementations can significantly impact your organization, and it’s common for stress levels to rise during the go-live process. But with the right assessment and preparation, you can lessen their impact and reduce staff stress. Our experienced, objective advisors work with public and private sector organizations across the country to oversee large enterprise projects from inception to successful completion. Please reach out to us to learn more about preparing for your next big project.

Related Industries

Related Services

Consulting

Information Systems

Read this if your organization, business, or institution has leases and you’ve been eagerly awaiting and planning for the implementation of the new lease standards.

Ready? Set? Not yet. As we have prepared for and experienced delays related to Financial Accounting Standards Board (FASB) Accounting Standards Codification Topic 842, Leases, and Governmental Accounting Standards Board (GASB) Statement No. 87, Leases, we thought the time had finally come for implementation. With the challenges that COVID-19 has brought to everyone, the FASB and GASB recognize the significant impact COVID-19 has had on commercial businesses, state and local governments, and not-for-profits and both have proposed delays in effective dates for various accounting standards, including both lease standards.

But wait, there’s more! In response to feedback FASB received during the comment period for the lease standard, the revenue recognition standard has also been extended. We didn’t see that coming, and expect that many organizations that didn’t opt for early adoption will breathe a collective sigh of relief.

FASB details and a deeper dive

On May 20, 2020, FASB voted to delay the effective date of the lease standard and the revenue recognition standard. A formal Accounting Standards Update (ASU) summarizing these changes will be released early June. Here’s what we know now:

  • Revenue recognition―for entities that have not yet issued financial statements, the effective date of the application of FASB Accounting Standards Codification (ASC) Topic 606, Revenue Recognition, has been delayed by 12 months (effective for reporting periods beginning after December 15, 2019). This does not apply to public entities or nonpublic entities that are conduit debt obligors who previously adopted this guidance.
  • Leases―for entities that have not yet adopted the guidance from ASC 842, Leases, the effective date has been extended by 12 months (effective for reporting periods beginning after December 15, 2021).
  • Early adoption of either standard is still allowed.

FASB has also provided clarity on lease concessions that are highlighted in Topic 842. 

We recognize many lessors are making concessions due to the pandemic. Under current guidance in Topics 840 and 842, changes to lease contracts that were not included in the original lease are generally accounted for as lease modifications and, therefore, a separate contract. This would require remeasurement of the new lease contract and related right-of-use asset. 

FASB recognized this issue and has published a FASB Staff Questions and Answers (Q&A) Document, Topic 842 and Topic 840: Accounting for Lease Concessions Related to the Effects of the COVID-19 Pandemic. Under this new guidance, if lease concessions are made relating to COVID-19, entities do not need to analyze each contract to determine if a new contract has been entered into, and will have the option to apply, or not to apply, the lease modification provisions of Topics 840 and 842.

GASB details

On May 8, 2020, GASB issued Statement No. 95, Postponement of the Effective Dates of Certain Authoritative Guidance. GASB 95 extends the implementation dates of several pronouncements including:
•    Statement No. 84, Fiduciary Activities―extended by 12 months (effective for reporting periods beginning after December 15, 2019)
•    Statement No. 87, Leases―extended by 18 months (effective for reporting periods beginning after June 15, 2021)

More information

If you have questions, please contact a member of our financial statement audit team. For other COVID-19 related resources, please refer to BerryDunn’s COVID-19 Resources Page.
 

Blog
May 2020 accounting standard delay status: GASB and FASB

Read this if you are planning for, or are in the process of implementing a new software solution.

User Acceptance Testing (UAT) is more than just another step in the implementation of a software solution. It can verify system functionality, increase the opportunity for a successful project, and create additional training opportunities for your team to adapt to the new software quickly. Independent verification through a structured user acceptance plan is essential for a smooth transition from a development environment to a production environment. 

Verification of functionality

The primary purpose of UAT is to verify that a system is ready to go live. Much of UAT is like performing a pre-flight checklist on an aircraft. Wings... check, engines... check, tires... check. A structured approach to UAT can verify that everything is working prior to rolling out a new software system for everyone to use. 

To hold vendors accountable for their contractual obligations, we recommend an agency test each functional and technical requirement identified in the statement of work portion of their contract. 

It is also recommended that the agency verify the functional and technical requirements that the vendor replied positivity to in the RFP for the system you are implementing. 

Easing the transition to a new software

Operational change management (OCM) is a term that describes a methodology for making the switch to a new software solution. Think of implementing a new software solution like learning a new language. For some employees, the legacy software solution is the only way they know how to do their job. Like learning a new language, changing the way business and learning a new software can be a challenging and scary task. The benefits outweigh the anxiety associated with learning a new language. You can communicate with a broader group of people, and maybe even travel the world! This is also true for learning a new software solution; there are new and exciting ways to perform your job.

Throughout all organizations there will be some employees resistant to change. Getting those employees involved in UAT can help. By involving them in testing the new system and providing feedback prior to implementation, they will feel ownership and be less likely to resist the change. In our experience, some of the most resistant employees, once involved in the process, become the biggest champions of the new system.  

Training and testing for better results

On top of the OCM and verification benefits a structured UAT can accomplish, UAT can be a great training opportunity. An agency needs to be able to perform actions of the tested functionality. For example, if an agency is testing a software’s ability to import a document, then a tester needs to be trained on how to do that task. By performing this task, the tester learns how to login to the software, navigate the software, and perform tasks that the end user will be accomplishing in their daily use of the new software. 

Effective UAT and change management

We have observed agencies that have installed software that was either not fully configured or the final product was not what was expected when the project started. The only way to know that software works how you want is to test it using business-driven scenarios. BerryDunn has developed a UAT process, customizable to each client, which includes a UAT tracking tool. This process and related tool helps to ensure that we inspect each item and develop steps to resolve issues when the software doesn’t function as expected. 

We also incorporate change management into all aspects of a project and find that the UAT process is the optimal time to do so. Following established and proven approaches for change management during UAT is another opportunity to optimize implementation of a new software solution. 

By building a structured approach to UAT, you can enjoy additional benefits, as additional training and OCM benefits can make the difference between forming a positive or a negative reaction to the new software. By conducting a structured and thorough UAT, you can help your users gain confidence in the process, and increase adoption of the new software. 

Please contact the team if you have specific questions relating to your specific needs, or to see how we can help your agency validate the new system’s functionality and reduce resistance to the software. We’re here to help.   
 

Blog
User Acceptance Testing: A plan for successful software implementation

The BerryDunn Recovery Advisory Team has compiled this guide to COVID-19 consulting resources for state and local government agencies and higher education institutions.

We have provided a list of our consulting services related to data analysis, CARES Act funding and procurement, and legislation and policy implementation. Many of these services can be procured via the NASPO ValuePoint Procurement Acquisition Support Services contract.

READ THE GUIDE NOW

We're here to help.
If you have any questions, please contact us at info@berrydunn.com

Blog
COVID-19 consulting resources

Read this if you are a CIO, CFO, Provost, or President at a higher education institution.

In my conversations with CIO friends over the past weeks, it is obvious that the COVID-19 pandemic has forced a lot of change for institutions. Information technology is the underlying foundation for supporting much of this change, and as such, IT leaders face a variety of new demands now and into the future. Here are important considerations going forward.

Swift impact to IT and rapid response

The COVID-19 pandemic has had a significant impact on higher education. At the onset of this pandemic, institutions found themselves quickly pivoting to work from home (WFH), moving to remote campus operations, remote instruction within a few weeks, and in some cases, a few days. Most CIOs I spoke with indicated that they were prepared, to some extent, thanks to Cloud services and online class offerings already in place—it was mostly a matter of scaling the services across the entire campus and being prepared for returning students and faculty on the heels of an extended spring break.

Services that were not in place required creative and rapid deployment to meet the new demand. For example, one CIO mentioned the capability to have staff accept calls from home. The need for softphones to accommodate student service and helpdesk calls at staff homes required rapid purchase, deployment, and training.

Most institutions have laptop loan programs in place but not scaled to the size needed during this pandemic. Students who choose to attend college on campus are now forced to attend school from home and may not have the technology they need. The need for laptop loans increased significantly. Some institutions purchased and shipped laptops directly to students’ homes. 

CIO insights about people

CIOs shared seeing positive outcomes with their staff. Almost all of the CIOs I spoke with mentioned how the pandemic has spawned creativity and problem solving across their organizations. In some cases, past staffing challenges were put on hold as managers and staff have stepped up and engaged constructively. Some other positive changes shared by CIOs:

  • Communication has improved—a more intentional exchange, a greater sense of urgency, and problem solving have created opportunities for staff to get engaged during video calls.
  • Teams focusing on high priority initiatives and fewer projects have yielded successful results. 
  • People feel a stronger connection with each other because they are uniting behind a common purpose.

Perhaps this has reduced the noise that most staff seem to hear daily about competing priorities and incoming requests that seem to never end.

Key considerations and a framework for IT leaders 

It is too early to fully understand the impact on IT during this phase of the pandemic. However, we are beginning to see budgetary concerns that will impact all institutions in some way. As campuses work to get their budgets settled, cuts could affect most departments—IT included. In light of the increased demand for technology, cuts could be less than anticipated to help ensure critical services and support are uninterrupted. Other future impacts to IT will likely include:

  • Support for a longer term WFH model and hybrid options
  • Opportunities for greater efficiencies and possible collaborative agreements between institutions to reduce costs
  • Increased budgets for online services, licenses, and technologies
  • Need for remote helpdesk support, library services, and staffing
  • Increased training needs for collaborative and instructional software
  • Increased need for change management to help support and engage staff in the new ways of providing services and support
  • Re-evaluation of organizational structure and roles to right-size and refocus positions in a more virtual environment
  • Security and risk management implications with remote workers
    • Accessibility to systems and classes 

IT leaders should examine these potential changes over the next three to nine months using a phased approach. The diagram below describes two phases of impact and areas of focus for consideration. 

Higher Education IT Leadership Phases

As IT leaders continue to support their institutions through these phases, focusing on meeting the needs of faculty, staff, and students will be key in the success of their institutions. Over time, as IT leaders move from surviving to thriving, they will have opportunities to be strategic and create new ways of supporting teaching and learning. While it remains to be seen what the future holds, change is here. 

How prepared are you to support your institution? 

If we can help you navigate through these phases, have perspective to share, or any questions, please contact us. We’re here to help.

Blog
COVID-19: Key considerations for IT leaders in Higher Ed

Read this if your organization, business, or institution has leases and you’ve been eagerly awaiting and planning for the implementation of the new lease standards.

Ready? Set? Not yet. As we have prepared for and experienced delays related to Financial Accounting Standards Board (FASB) Accounting Standards Codification Topic 842, Leases, we thought the time had finally come for implementation. With the challenges that COVID-19 has brought to everyone, the FASB recognizes the significant impact COVID-19 has brought to commercial businesses and not-for-profits and is proposing a one-year delay in implementation, as described in this article posted to the Journal of Accountancy: FASB effective date delay proposals to include private company lease accounting.

But what about lease concessions? We all recognize many lessors are making concessions due to the pandemic. Under current guidance in Topics 840 and 842, changes to lease contracts that were not included in the original lease are generally accounted for as lease modifications and, therefore, a separate contract. This would require remeasurement of the new lease contract and related right-of-use asset. FASB recognized this issue and has published a FASB Staff Questions and Answers (Q&A) Document,  Topic 842 and Topic 840: Accounting for Lease Concessions Related to the Effects of the COVID-19 Pandemic. Under this new guidance, if lease concessions are made relating to COVID-19, entities do not need to analyze each contract to determine if a new contract has been entered into, and will have the option to apply, or not to apply, the lease modification provisions of Topics 840 and 842.

Implementation of the lease accounting standard will most likely be delayed for Governmental Accounting Standards Board (GASB) entities as well. On April 15, 2020, the GASB issued an exposure draft that would delay most GASB statements and implementation guides due to be implemented for fiscal years 2019 and later. Most notably, this includes Statement 84, Fiduciary Activities, and Statement 87, Leases. Comments on the proposal will be accepted through April 30, and the board plans to consider a final statement for issuance on May 8. More information may be found in this article from the Journal of Accountancy: GASB proposes postponing effective dates due to pandemic.

More information

Whether you are a FASB or GASB entity, you can expect a delay in the implementation of the lease standard. If you have questions, please contact a member of our financial statement audit team. For other COVID-19 related resources, please refer to BerryDunn’s COVID-19 Resources Page.

Blog
FASB and GASB news: Postponement of the lease accounting standards

Read this if you are an IT Leader, CFO, COO, or other C-suite leader responsible for selecting a new system.

Vendor demonstrations are an important milestone in the vendor selection process. Demonstrations allow you to validate what a vendor’s software is capable of, evaluate the usability with your own eyes, and confirm the fit to your organization’s objectives.

Our client found itself in a situation where, after many months of work developing requirements, issuing a request for proposal, and reviewing vendor proposals they were ready to conduct demonstrations. Despite a governor’s executive order for social distancing and limitations on non-essential travel, our client needed to conduct demonstrations to achieve an important project milestone. This presented an opportunity to help them plan, test, and facilitate remote vendor demonstrations with great success.

This brief case study shares some of the key success factors we found in conducting remote demonstrations and some lessons learned after they were complete.

  1. Prepare 
    Establish a clear agenda, schedule, script, and plan in advance of the demonstrations. This helps keep everyone coordinated throughout the demos.
  2. Test
    It is important to test the vendor’s video conference solution from all locations prior to the demonstrations. We tested with both vendors a week ahead of demos.
  3. Establish Ground Rules
    Establishing ground rules allows the meetings to go better, be more efficient, and stay on time. For example, is a moment of silence a consensus to move on or must you wait for someone to unmute their line to verbally confirm to proceed.
  4. Have clear roles by location
    Clear roles help to facilitate the demonstration. Designated time keepers, scribes, and local facilitators help the demonstration go smoothly, and decreases communication issues.
  5. Be close to the microphone
    Essential common sense, but when you can’t see everyone, loud, clear questions and answers make the demos more effective.
  6. Ask vendors to build in pauses to allow for questions
    Since vendors may not be able to see a hand raised, asking vendors to build specific pauses into their demonstrations allows space for questions to be asked easily.
  7. Do a virtual debrief 
    At the end of each vendor demonstration we had our own videoconferencing meeting set up to facilitate a virtual debrief. This allowed us to capture the evaluation notes of the day prior to the next demo. Planning these in advance and having them on people’s calendars made joining the meetings quick and seamless.

Observations and other lessons learned

Following the remote demonstrations we identified a few observations and lessons learned:

  1. Visibility was better
    By not having everyone crowded into one room, people were able to see the screen and the vendor’s software clearly.
  2. Different virtual platforms required orientation
    We wanted vendors to use the tools they were accustomed to using. This led to us using different products for different demonstrations. This was not insurmountable, but required orientation to get used to their tools at the start of each demo.
  3. Video helped debriefing
    Given the quick planning we did not have video capability from all locations for our virtual debrief. It was helpful to see the people sharing their comments following each demonstration. We will plan for video capabilities at all locations next time.
  4. Having a set order for people to provide feedback helped
    During the first debriefing, we established a set order for people to speak and share their thoughts. This limited talking over each other and allowed everyone to hear the thoughts of their peers clearly.
  5. Be patient with slowness
    For the most part we had successful demos with limited slowness. There were a couple points where slowness was encountered. We remained patient, adjusted the schedule, and in the worst case, added an extra break for people.
  6. Staying engaged takes effort
    Sitting all day on a remote demo and paying attention took effort to stay engaged. Building in specific times for Q&A, calling on people by name, and designing it so it wasn’t eight hours straight of presentation helped with engagement.

Restricted travel in response to COVID-19 has led our clients and our teams to be creative and agile in achieving objectives. The remote demonstrations proved highly successful, accomplished the goals, and met our client’s critical timing milestone. At the end of four days of demos, our client commented that the remote demos were perhaps even better than if they had been conducted onsite. As we look at the long view, we may find that clients prefer remote demonstrations even when social distancing and travel restrictions are lifted.

Blog
Social distancing case study: Hosting remote vendor demonstrations

Read this if you are an IT Leader, CMO, CNO, CFO, or COO in a healthcare setting that may be looking at offering telehealth services.

Adopting telehealth technology is happening rapidly in response to social distancing and the strain that COVID-19 is putting on health systems. In response to this strain and with focus on "flattening the curve" by improving access amid a torrent of temporarily closed provider offices, some state and federal restrictions on telehealth have been lifted with the passage of the CARES Act.  

So, now, the question is not if your organization should implement telehealth services but how do you do it rapidly, effectively, holistically, and with an eye on wide-spread adoption?  

Telehealth is a bit more complex than other services, because it requires a patient to be able to use technology and follow through on provider advice―without physical discussion and interaction. Taking the time with your clinicians to increase their comfort using the technology can help put your patients at ease during this uncertain time while maintaining the clinician-patient relationship. Here are things to consider to become effective with telehealth programs:

  1. Identify purpose and goals. Do you want to expand access, support more patients, improve outcomes, support social distancing, or have further geographic reach? All of the above? 
  2. Choose an approach. Use existing technology within your EHR or use a third party solution.
  3. Test the solution. Check connectivity, devices (iPhone vs Android), and patient skill level.
  4. Camera placement is important. Making sure the patient can see the provider will be important for patients.
  5. Practice with a colleague and an open mind. Develop confidence and help foster patient trust. 
  6. Be adaptable to this being different. As this is new for all parties, showing patience and maintaining calm goes a long way to help ease patient worry.
  7. Consider and plan for the patient’s technical ability, or lack thereof. Be prepared to help troubleshoot minor technical barriers or utilize alternative processes without hampering the clinical encounter. 
  8. Look directly into the camera. Helps establish and maintain the patient-provider relationship. 
  9. Document in real time. Complete good notes, as the volume of telehealth visits and lack of physical proximity to the patient will make it more challenging to remember details later. 
  10. Develop “how to” content for your staff. This will help front line staff explain what the patient should expect before the visit and will outline clear follow up procedures, should there be any technical issues.

Once you have the more technical pieces planned, the keys to success will be testing technology and workflow and embracing the change. As we know, it doesn’t take much for a vulnerable patient to lose ground. Now is the time to expand your reach, lower costs, improve outcomes, improve relationships, show adaptability, sustain progress, and send healthcare directly into the home.

We are here to help
If you have any questions about your specific needs, please contact the healthcare consulting team.

Blog
How to effectively implement telehealth services

Read this if you are a State Medicaid Director, State Medicaid Chief Information Officer, State Medicaid Project Manager, or State Procurement Officer—or if you work on a State Medicaid Enterprise System (MES) certification effort.

On October 24, 2019, the Centers for Medicaid and Medicare Services (CMS) published the Outcomes-Based Certification (OBC) guidance for the Electronic Visit Verification (EVV) module. Now, CMS is looking to bring the OBC process to the rest of the Medicaid Enterprise. 

The shift from a technical-focused certification to a business outcome-focused approach presents a unique opportunity for states as they begin re-procuring—and certifying—their Medicaid Enterprise Systems (MES).

Once you have defined the scope of your MES project—and know you need to undertake CMS certification—you need to ask “what’s next?” OBC can be a more efficient certification process to secure Federal Financial Participation (FFP).

What does OBC certification entail?

Rethinking certification in terms of business outcomes will require agencies to engage business and operations units at the earliest possible point of the project development process to define the program goals and define what a successful implementation is. One way to achieve this is to consider MES projects in three steps. 

Three steps to OBC evaluation

Step 1: Define outcomes

The first step in OBC planning seems easy enough: define outcomes. But what is an outcome? To answer that, it’s important to understand what an outcome isn’t. An outcome isn’t an activity. Instead, an outcome is the result of the activity. For example, the activity could be procuring an EVV solution. In this instance, an outcome could be that the state has increased the ability to detect fraud, waste, and abuse through increased visibility into the EVV solution.

Step 2: Determine measurements

The second step in the OBC process is to determine what to measure and how exactly you will measure it. Deciding what metrics will accurately capture progress toward the new outcomes may be intuitive and therefore easy to define. For example, a measure might simply be that each visit is captured within the EVV solution.

Increasing the ability to detect fraud, waste, and abuse could simply be measured by the number of cases referred to a Medicaid fraud unit or dollars recovered. However, you may not be able to easily measure that in the short-term. Instead, you may need to determine its measurement in terms of an intermediate goal, like increasing the number of claims checked against new data as a result of the new EVV solution. By increasing the number of checked claims, states can ensure that claims are not being paid for unverified visits. 

Step 3: Frequency and reporting

Finally, the state will need to determine how often to report to measure success. States will need to consider the nuances of their own Medicaid programs and how those nuances fit into CMS’ expectations, including what data is available at what intervals.

OBC represents a fundamental change to the certification process, but it’s important to highlight that OBC isn’t completely unfamiliar territory. There is likely to be some carry-over from the certification process as described in the Medicaid Enterprise Certification Toolkit (MECT) version 2.3. The current Medicaid Enterprise Certification (MEC) checklists serve as the foundation for a more abbreviated set of criteria. New evaluation criteria will look and feel like the criteria of old but are likely to be a fraction of the 741 criteria present in the MECT version 2.3.

OBC offers several benefits to states as you navigate federal certification requirements:

  1. You will experience a reduction in the amount of time, effort, and resources necessary to undertake the certification process. 
  2. OBC refocuses procurement in terms of enhancements to the program, not in new functions. Consequently, states will also be able to demonstrate the benefits that each module brings to the program which can be integral to stakeholder support of each module. 
  3. Early adoption of the OBC process can allow you to play a more proactive role in certification efforts.

Continue to check back for a series of our project case studies. Additionally, if you are considering an OBC effort and have questions, please contact our team. You can read the OBC guidance on the CMS website here
 

Blog
Three steps to outcomes-based certification

Editor's note: read this blog if you are a state liquor administrator or at the C-level in state government. 

Surprisingly, the keynote address to this year’s annual meeting of the National Alcohol Beverage Control Association (NABCA) featured few comments on, well, alcohol. 

Why? Because cannabis is now the hot topic in state government, as consumers await its legalization. While the thought of selling cannabis may seem foreign to some state administrators, many liquor agencies are―and should be―watching. The fact is, state liquor agencies are already equipped with expertise and the technology infrastructure needed to lawfully sell a controlled substance. This puts them in a unique position to benefit from the industry’s continued growth. Common technology includes enterprise resource planning (ERP) and point-of-sale (POS) systems.

ERP

State liquor agencies typically use an ERP system to integrate core business functions, including finance, human resources, and supply chain management. Whether the system is handling bottles of wine, cases of spirits, or bags of cannabis, it is capable of achieving the same business goals. 

The existing checks and balances on controlled substances like alcohol in their current ERP system translate well to cannabis products. This leads to an important point: state governments do not need to procure a new IT system solely for regulating cannabis.

By leveraging existing ERP systems, state liquor agencies can sidestep much of the time, effort, and expense of selecting, procuring, and implementing a new system solely for cannabis sales and management. In control states, where the state has exclusively control of alcohol sales, liquor agencies are often involved in every stage of product lifecycle, from procurement to distribution to retailing.

With a few modifications, the spectrum of business functions that control states require for liquor—procuring new product, communicating with vendors and brokers, tracking inventory, and analyzing sales—can work just as well for cannabis.

POS

POS systems are necessary for most retail stores. If a state liquor agency decides to sell cannabis products in stores, they can use a POS system to integrate with the agency’s ERP system, though store personnel may require training to help ensure compliance with related regulations.

Cannabis is cash only (for now)

There is one major difference in conducting liquor versus cannabis sales at any level: currently states conduct all cannabis sales in cash. With cannabis illegal on the federal level, major banks have opted to decline any deposit of funds earned from cannabis-related sales. While some community banks are conducting cannabis-related banking, many retailers selling recreational cannabis in places like Colorado and California still deal in cash. While risky and not without challenges, these transactions are possible and less onerous to federal regulators. 

Taxes 

As markets develop, monthly tax revenue collections from cannabis continue to grow. Colorado and California have found cannabis-related tax revenue a powerful tool in hedging against uncertainty in year-over-year cash flows. Similar to beer sold wholesale, which liquor agencies tax even in control states, cannabis can be taxed at multiple levels depending on the state’s business model.

E-commerce

Even with liquor, few state agencies have adopted direct-to-consumer online sales. However, as other industries continue shifting toward e-commerce and away from brick and mortar retailing, private sector competition will likely feed increased consumer demand for online sales. Similar to ERP and POS systems, states can increase revenue by selling cannabis through e-commerce sales channels. In today’s online retail world, many prefer to buy products from their computer or smart phone instead of shopping in stores. State agencies should consider selling cannabis via the web to maximize this revenue opportunity. 

Applying expertise in the systems and processes of alcoholic beverage control can translate into the sale and regulation of cannabis, easing the transition states face to this burgeoning industry. If your agency is considering bringing in cannabis under management, you should consider strategic planning sessions and even begin a change management approach to ensure your agency adapts successfully. 

Blog
Considering cannabis: How state liquor agencies can manage the growing industry

A version of this article was previously published on the Massachusetts Nonprofit Network

Editor’s note: while this blog is not technical in nature, you should read it if you are involved in IT security, auditing, and management of organizations that may participate in strategic planning and business activities where considerations of compliance and controls is required.

As we find ourselves in a fast-moving, strong business growth environment, there is no better time to consider the controls needed to enhance your IT security as you implement new, high-demand technology and software to allow your organization to thrive and grow. Here are five risks you need to take care of if you want to build or maintain strong IT security.

1. Third-party risk management―It’s still your fault

We rely daily on our business partners and vendors to make the work we do happen. With a focus on IT, third-party vendors are a potential weak link in the information security chain and may expose your organization to risk. However, though a data breach may be the fault of a third-party, you are still responsible for it. Potential data breaches and exposure of customer information may occur, leaving you to explain to customers and clients answers and explanations you may not have. 

Though software as a service (SaaS) providers, along with other IT third-party services, have been around for well over a decade now, we still neglect our businesses by not considering and addressing third-party risk. These third-party providers likely store, maintain, and access company data, which could potentially contain personally identifiable information (names, social security numbers, dates of birth, addresses), financial information (credit cards or banking information), and healthcare information of your customers. 

While many of the third-party providers have comprehensive security programs in place to protect that sensitive information, a study in 2017 found that 30% of data breaches were caused by employee error or while under the control of third-party vendors.1  This study reemphasizes that when data leaves your control, it is at risk of exposure. 

In many cases, procurement and contracting policies likely have language in contracts that already establish requirements for third-parties related to IT security; however the enforcement of such requirements and awareness of what is written in the contract is not enforced or is collected, put in a file, and not reviewed. What can you do about it?

Improved vendor management

It is paramount that all organizations (no matter their size) have a comprehensive vendor management program that goes beyond contracting requirements in place to defend themselves against third-party risk which includes:

  1. An inventory of all third-parties used and their criticality and risk ranking. Criticality should be assigned using a “critical, high, medium or low” scoring matrix. 
  2. At time of onboarding or RFP, develop a standardized approach for evaluating if potential vendors have sufficient IT security controls in place. This may be done through an IT questionnaire, review of a Systems and Organization Controls (SOC report) or other audit/certifications, and/or policy review. Additional research may be conducted that focuses on management and the company’s financial stability. 
  3. As a result of the steps in #2, develop a vendor risk assessment using a high, medium and low scoring approach. Higher risk vendors should have specific concerns addressed in contracts and are subject to more in depth annual due diligence procedures. 
  4. Reporting to senior management and/or the board annually on the vendors used by the organization, the services they perform, their risk, and ways the organization monitors the vendors. 

2. Regulation and privacy laws―They are coming 

2018 saw the implementation of the European Union’s General Data Privacy Regulation (GDPR) which was the first major data privacy law pushed onto any organization that possesses, handles, or has access to any citizen of EU’s personal information. Enforcement has started and the Information Commissioner’s Office has begun fining some of the world’s most famous companies, including substantial fines to Marriott International and British Airways of $125 million and $183 million Euros, respectively.2  Gone are the days where regulations lacked the teeth to force companies into compliance. 

With thanks to other major data breaches where hundreds of millions’ consumers private information was lost or obtained (e.g., Experian), more regulation is coming. Although there is little expectation of an American federal requirement for data protection, individual states and other regulating organizations are introducing requirements. Each new regulation seeks to protect consumer privacy but the specifics and enforcement of each differ. 

Expected to be most impactful in 2019 is the California Consumer Privacy Act,  which applies to organizations that handle, collect, or process consumer information and do business in the state of California (you do not have to be located in CA to be under the umbrella of enforcement).

In 2018, Maine passed the toughest law on telecommunications providers for selling consumer information. Massachusetts’ long standing privacy and data breach laws were amended with stronger requirements in January of 2019. Additional privacy and breach laws are in discussion or on the table for many states including Colorado, Delaware, Ohio, Oregon, Ohio, Vermont, and Washington, amongst others.      

Preparation and awareness are key

All organizations, no matter your line of business must be aware of and understand current laws and proposed legislation. New laws are expected to not only address the protection of customer data, but also employee information. All organizations should monitor proposed legislation and be aware of the potential enforceable requirements. The good news is that there are a lot of resources out there and, in most cases, legislative requirements allow for grace periods to allow organizations to develop a complete understanding of proposed laws and implement needed controls. 

3. Data management―Time to cut through the clutter 

We all work with people who have thousands of emails in their inbox (in some cases, dating back several years). Those users’ biggest fears may start to come to fruition―that their “organizational” approach of not deleting anything may come to an end with a simple email and data retention policy put in place by their employer. 

The amount of data we generate in a day is massive. Forbes estimates that we generate 2.5 quintillion bytes of data each day and that 90% of all the world’s data was generated in the last two years alone.3 While data is a gold mine for analytics and market research, it is also an increasing liability and security risk. 

Inc. Magazine says that 73% of the data we have available to us is not used.4 Within that data could be personally identifiable information (such as social security numbers, names, addresses, etc.); financial information (bank accounts, credit cards etc.); and/or confidential business data. That data is valuable to hackers and corporate spies and in many cases data’s existence and location is unknown by the organizations that have it. 

In addition to the security risk that all this data poses, it also may expose an organization to liability in the event of a lawsuit of investigation. Emails and other communications are a favorite target of subpoenas and investigations and should be deleted within 90 days (including deleted items folders). 

Take an inventory before you act

Organizations should first complete a full data inventory and understand what types of data they maintain and handle, and where and how they store that data. Next, organizations can develop a data retention policy that meets their needs. Utilizing backup storage media may be a solution that helps reduce the need to store and maintain a large amount of data on internal systems. 

4. Doing the basics right―The simple things work 

Across industries and regardless of organization size, the most common problem we see is the absence of basic controls for IT security. Every organization, no matter their size, should work to ensure they have controls in place. Some must-haves:

  • Established IT security policies
  • Routine, monitored patch management practices (for all servers and workstations)
  • Change management controls (for both software and hardware changes)
  • Anti-virus/malware on all servers and workstations
  • Specific IT security risk assessments 
  • User access reviews
  • System logging and monitoring 
  • Employee security training

Go back to the basics 

We often see organizations that focus on new and emerging technologies, but have not taken the time to put basic security controls in place. Simple deterrents will help thwarting hackers. I often tell my clients a locked car scares away most ill-willed people, but a thief can still smash the window.  

Smaller organizations can consider using third-party security providers, if they are not able to implement basic IT security measures. From our experience, small organizations are being held to the same data security and privacy expectations by their customers as larger competitors and need to be able to provide assurance that controls are in place.  

5. Employee retention and training 

Unemployment rates are at an all-time low, and the demand for IT security experts at an all-time high. In fact, Monster.com reported that in 2019 the unemployment rate for IT security professionals is 0%.5 

Organizations should be highly focused on employee retention and training to keep current employees up-to-speed on technology and security trends. One study found that only 15% of IT security professionals were not looking to switch jobs within one year.6  

Surprisingly, money is not the top factor for turnover―68% of respondents prioritized working for a company that takes their opinions seriously.6 

For years we have told our clients they need to create and foster a culture of security from the top down, and that IT security must be considered more than just an overhead cost. It needs to align with overall business strategy and goals. Organizations need to create designated roles and responsibilities for security that provide your security personnel with a sense of direction―and the ability to truly protect the organization, their people, and the data. 

Training and support goes a long way

Offering training to security personnel allows them to stay abreast of current topics, but it also shows those employees you value their knowledge and the work they do. You need to train technology workers to be aware of new threats, and on techniques to best defend and protect from such risks. 

Reducing turnover rate of IT personnel is critical to IT security success. Continuously having to retrain and onboard employees is both costly and time-consuming. High turnover impacts your culture and also hampers your ability to grow and expand a security program. 

Making the effort to empower and train all employees is a powerful way to demonstrate your appreciation and support of the employees within your organization—and keep your data more secure.  

Our IT security consultants can help

Ensuring that you have a stable and established IT security program in place by considering the above risks will help your organization adapt to technology changes and create more than just an IT security program, but a culture of security minded employees. 

Our team of IT security and control experts can help your organization create and implement controls needed to consider emerging IT risks. For more information, contact the team
 

Sources:
[1] https://iapp.org/news/a/surprising-stats-on-third-party-vendor-risk-and-breach-likelihood/  
[2] https://resources.infosecinstitute.com/first-big-gdpr-fines/
[3] https://www.forbes.com/sites/bernardmarr/2018/05/21/how-much-data-do-we-create-every-day-the-mind-blowing-stats-everyone-should-read/#458b58860ba9
[4] https://www.inc.com/jeff-barrett/misusing-data-could-be-costing-your-business-heres-how.html
[5] https://www.monster.com/career-advice/article/tech-cybersecurity-zero-percent-unemployment-1016
[6] https://www.securitymagazine.com/articles/88833-what-will-improve-cyber-talent-retention

Blog
Five IT risks everyone should be aware of

Editor’s note: If you are a higher education CFO, CIO, CTO or other C-suite leader, this blog is for you.

The Gramm-Leach-Bliley Act (GLBA) has been in the news recently as the Federal Trade Commission (FTC) has agreed to extend a deadline for public comment regarding proposed changes to the Safeguards Rule. Here’s what you need to know.

GLBA, also known as the Financial Modernization Act, is a 1999 federal law providing rules to financial institutions for protecting consumer information. Colleges and universities fall under this act because they conduct financial activities (e.g., administration of financial aid, loans, and other financial services).

Under the Safeguards Rule financial Institutions must develop, implement, and maintain a comprehensive information security program that consists of safeguards to handle customer information.

Proposed changes

The FTC is proposing five modifications to the Safeguards Rule. The new act will:

  • Provide more detailed guidance to impacted institutions regarding how to develop and implement specific aspects of an overall information security program.
  • Improve the accountability of an institution’s information security programs.
  • Exempt small business from certain requirements.
  • Expand the definition of “financial institutions” to include entities engaged in activities that the Federal Reserve Board determines to be incidental to financial activities.
  • Propose to include the definition of “financial institutions” and related examples in the rule itself rather than cross-reference them from a related FTC rule (Privacy of Consumer Financial Information Rule).

Potential impacts for your institution

The Federal Register, Volume 84, Number 65, published the notice of proposed changes that once approved by the FTC would add more prescriptive rules that could have significant impact on your institution. For example, these rules would require institutions to:

  1. Expand existing security programs with additional resources.
  2. Produce additional documentation.
  3. Create and implement additional policies and procedures.
  4. Offer various forms of training and education for security personnel.

The proposed rules could require institutions to increase their commitment in time and staffing, and may create hardships for institutions with limited or challenging resources.

Prepare now

While these changes are not final and the FTC is requesting public comment, here are some things you can do to prepare for these potential changes:

  • Evaluate whether your institution is compliant to the current Safeguards Rule.
  • Identify gaps between current status and proposed changes.
  • Perform a risk assessment.
  • Ensure there is an employee designated to lead the information security program.
  • Monitor the FTC site for final Safeguard Rules updates.

In the meantime, reach out to us if you would like to discuss the impact GLBA will have on your institution or if you would like assistance with any of the recommendations above. You can view a comprehensive list of potential changes here.

Source: Federal Trade Commission. Safeguards Rule. Federal Register, Vol. 84, No. 65. FTC.gov. April 4, 2019. https://www.ftc.gov/enforcement/rules/rulemaking-regulatory-reform-proceedings/safeguards-rule

Blog
Higher ed: GLBA is the new four-letter word, but it's not as bad as you think

Focus on the people: How higher ed institutions can successfully make an ERP system change

The enterprise resource planning (ERP) system is the heart of an institution’s business, maintaining all aspects of day-to-day operations, from student registration to staff payroll. Many institutions have used the same ERP systems for decades and face challenges to meet the changing demands of staff and students. As new ERP vendors enter the marketplace with new features and functionality, institutions are considering a change. Some things to consider:

  1. Don’t just focus on the technology and make change management an afterthought. Transitioning to a new ERP system takes considerable effort, and has the potential to go horribly wrong if sponsorship, good planning, and communication channels are not in place. The new technology is the easy part of a transition—the primary challenge is often rooted in people’s natural resistance to change.  
  2. Overcoming resistance to change requires a thoughtful and intentional approach that focuses on change at the individual level. Understanding this helps leadership focus their attention and energy to best raise awareness and desire for the change.
  3. One effective tool that provides a good framework for successful change is the Prosci ADKAR® model. This framework has five distinct phases that align with ERP change:

These phases provide an approach for developing activities for change management, preparing leadership to lead and sponsor change and supporting employees through the implementation of the change.

The three essential steps to leveraging this framework:

  1. Perform a baseline assessment to establish an understanding of how ready the organization is for an ERP change
  2. Provide sponsorship, training, and communication to drive employee adoption
  3. Prepare and support activities to implement, celebrate, and sustain participation throughout the ERP transition

Following this approach with a change management framework such as the Prosci ADKAR® model can help an organization prepare, guide, and adopt ERP change more easily and successfully. 

If you’re considering a change, but need to prepare your institution for a healthy ERP transition using change management, chart yourself on this ADKAR framework—what is your organization’s change readiness? Do you have appropriate buy-in? What problems will you face?

You now know that this framework can help your changes stick, and have an idea of where you might face resistance. We’re certified Prosci ADKAR® practitioners and have experience guiding Higher Ed leaders like you through these steps. Get in touch—we’re happy to help and have the experience and training to back it up. Please contact the team with any questions you may have.

1Prosci ADKAR®from http://www.prosci.com

Blog
Perspectives of an Ex-CIO

Law enforcement, courts, prosecutors, and corrections personnel provide many complex, seemingly limitless services. Seemingly is the key word here, for in reality these personnel provide a set number of incredibly important services.

Therefore, it should surprise no one that justice and public safety (J&PS) IT departments should also provide a well-defined set of services. However, these departments are often viewed as parking lots for all technical problems. The disconnect between IT and other J&PS business units often stems from differences in organizational culture and structure, and differing department objectives and goals. As a result, J&PS organizations often experience misperception between business units and IT. The solution to this disconnect and misperception? Defining IT department services.

The benefits of defined IT services

  1. Increased business customer satisfaction. Once IT services align with customer needs, and expectations are established (e.g., service costs and service level agreements), customers can expect to receive the services they agreed to, and the IT department can align staff and skill levels to successfully meet those needs.
  2. Improved IT personnel morale. With clear definition of the services they provide to their customers, including clearly defined processes for customers to request those services, IT personnel will no longer be subject to “rogue” questions or requests, and customers won’t be inclined to circumvent the process. This decreases IT staff stress and enables them to focus on their roles in providing the defined services. 
  3. Better alignment of IT services to organizational needs. Through collaboration between the business and IT organizations, the business is able to clearly articulate the IT services that are, and aren’t, required. IT can help define realistic service levels and associated services costs, and can align IT staff and skills to the agreed-upon services. This results in increased IT effectiveness and reduced confusion regarding what services the business can expect from IT.
  4. More collaboration between IT and the organization. The collaboration between the IT and business units in defining services results in an enhanced relationship between these organizations, increasing trust and clarifying expectations. This collaborative model continues as the services required by the business evolve, and IT evolves to support them.
  5. Reduced costs. J&PS organizations that fail to strategically align IT and business strategy face increasing financial costs, as the organization is unable to invest IT dollars wisely. When a business doesn’t see IT as an enabler of business strategy, IT is no longer the provider of choice—and ultimately risks IT services being outsourced to a third-party vendor.

Next steps
Once a J&PS IT department defines its services to support business needs, it then can align the IT staffing model (i.e., numbers of staff, skill sets, roles and responsibilities), and continue to collaborate with the business to identify evolving services, as well as remove services that are no longer relevant. Contact us for help with this next step and other IT strategies and tactics for justice and public safety organizations.

Blog
The definition of success: J&PS IT departments must define services

While new software applications help you speed up processes and operations, deciding which ones will work best for your organization can quickly evolve into analysis paralysis, as there are so many considerations.

Case in point: Software as a Service (SaaS) model
The benefits of the SaaS model, in which a vendor remotely hosts an organization’s applications, are fairly well known: your organization doesn’t have to shell out for costly hardware, the vendor tackles upgrades, backups, data recovery, and security, and you have more time and money to focus on your business goals.

There are multiple factors to look at when determining whether a SaaS solution is right for you. We’ve compiled a list of the top three SaaS considerations:

1. Infrastructure and capacity
Your organization should consider your own people, processes, and tools when determining whether SaaS makes sense. While an on-site solution may require purchasing new technologies, hiring new staff, and realigning current roles and responsibilities to maintain the system, maintaining a SaaS solution may also require infrastructure updates, such as increased bandwidth to sufficiently connect to the vendor's hosting site.

Needless to say, it’s one thing to maintain a solution; it’s an entirely different thing to keep it secure. An on-site hosting solution requires constant security upgrades, internal audits, and a backup system—all of which takes time and money. A SaaS model requires trust in your vendor to provide security. Make sure your potential vendor uses the latest security measures and standards to keep your critical business data safe and secure.

2. Expense
When you purchase major assets—for example, hardware to host its applications—it incurs capital expenses. Conversely, when you spend money on day-to-day operations (SaaS subscriptions), it incurs operating expenses.

You should weigh the pros and cons of each type of expense when considering a SaaS model. On-site upfront capital expenses for hosting hardware are generally high, and expenses can spike overtime when you update the technology, which can be difficult to predict. And don’t forget about ongoing costs for maintenance, software upgrades, and security patches.

In the SaaS model, you spread out operating costs over time and can predict costs because you are paying via subscription—which generally includes costs for maintenance, software upgrades, and security patches. However, remember you can depreciate capital expenses over time, whereas the deductibility of operating expenses are generally for the year you use them.

3. Vendor viability
Finally, you need to conduct due diligence and vet SaaS vendors before closing the deal. Because SaaS vendors assume the responsibility for vital processes, such as data recovery and security, you need to make sure the potential vendor is financially stable and has a sustainable business model. To help ensure you receive the best possible service, select a vendor considered a leader in its market sector. Prepare a viable exit strategy beforehand so you can migrate your business processes and data easily in case you have any issues with the SaaS provider.

You must read—and understand—the fine print. This is especially important when it comes to the vendor’s policies toward data ownership and future migrations to other service providers, should that become necessary. In other words: Make sure you have final say and control over your data.

Every organization has different aspects of their situation to consider when making a SaaS determination. Want to learn more? It’s a snap! Contact the authors: Clark Lathrum and Matthew Tremblay

Blog
SaaS: Is it right for you? Making SaaS determinations a snap.

Because we’ve been through this process many times, we’ve learned a few lessons and determined some best practices. Here are some tips to help you promote a positive post go-live experience.

The road to go-live is paved with good intentions. When an organization identifies a need to procure a new or upgraded system, that road can be long. It requires extensive planning, building a business case, defining requirements, procuring the system, testing it, and implementing it. Not to mention preparing your team to start using it. You’ve worked really hard to get to this point, and it feels like you’re about to cross the finish line. Well, grab some Gatorade because you’re not quite there yet. Post go-live is your cool-down, and it’s an important part of the race.

Preparation is key.
If you haven’t built a go-live plan into your overall implementation plan, you may see stress levels rise significantly in the days and weeks leading up to go-live. Like a runner prepares for a big race, a project lead must adequately prepare the team to begin using the new system, while still handling unexpected obstacles.  While there are many questions you should ask as you prepare to go live, you need to gain buy-in on the plan from the beginning and manage it to ensure follow-through.

Have your contract and deliverables handy.
Your system vendor implementation team will look to hand you off to their support team soon after go-live. It is crucial that you review all of the deliverables outlined in your contract to ensure all of the agreed-upon functionality is up and running, and all contracted deliverables have been provided and approved. Don’t transition to support until you’ve had enough time to see the system through significant processes (e.g. payroll, month-end close). In the period immediately after go-live, the vendor implementation team is your best resource to help address these issues, so it’s a good idea to have easy access to them.

Encourage use and feedback.
Functional leads and project champions need to continue communications past go-live to encourage use and provide a mechanism for addressing feedback. Employing change management best practices will go a long way in ensuring you use the system properly — and to its best capabilities.

Plan ahead for expanded use and future issues. 
Because a system implementation can be extremely resource-intensive, it is common to suppress or forgo functionality to implement at a later date (e.g., citizen and vendor self-service). In addition, we sometimes see issues arise during significant operational milestones (e.g., renewal processing, year-end close). Have a plan in place to decide how you will address known and unknown issues that arise.

While there is no silver bullet to solve all of the potential go-live woes, you can promote a smooth transition from a legacy system to a new system by implementing these tips. The time you spend up front will help offset many headaches down the road, promote end-user engagement, and ensure you’re getting the most from your investment.