Skip to Main Content

insightsarticles

The clock is ticking: Get ready for CMS's new MES templates by July 1, 2026

02.18.26 /

When CMS previewed its streamlined Medicaid Enterprise System (MES) templates at the Medicaid Enterprise Systems Conference (MESC) in August 2025, the message was clear: change is coming. And guess what? Change arrived with the start of the new year when CMS officially released eight new templates to standardize processes, improve oversight, and accelerate federal reviews. States and territories now have six months to adopt these templates, with full compliance required by July 1, 2026.

The clock is ticking! Early adoption isn’t just encouraged, it’s strategic. Here’s what these templates are, why they matter, and how you can confidently prepare for the required adoption of these templates and related processes.

What’s new? The eight CMS templates at a glance

CMS’ new artifacts support the full MES lifecycle, from planning and procurement to operations and certification. Here’s a quick overview:

1. MES APD Template
A standardized structure for Planning, Implementation, Update, and As-Needed APD submissions, supporting MMIS and E&E individually or combined.

Why it matters: Prescribes updated and uniform expectations for APD sections, including reducing or eliminating non-essential content.

2. MES Operational APD (OAPD) Template
A uniform format for operational APDs used to maintain and enhance existing modules.

Why it matters: Enhances transparency into operational activities by clearly defining scope, funding needs, and timelines, improving predictability for Medicaid agencies and CMS while supporting continuous system improvement.

3. Medicaid Detailed Budget Table (MDBT)
A common budget layout that simplifies federal review by organizing costs predictably.

Why it matters: Integrates MES and E&E funding into a single consolidated MDBT, promoting greater alignment across the Medicaid program and providing a more holistic perspective on SMAs' budgets and expenditures.

4. Operational Report Workbook (ORW)
Monthly operational reporting aligned to maintain enhanced federal match and improve data consistency.

Why it matters: Creates a consistent, module-based reporting structure across states, improving data quality, aggregation, and CMS visibility into Medicaid operations.

5. Analysis of Alternatives (AoA) Template
A structured approach to document solution options, risks, costs, and reuse opportunities.

Why it matters: Supports sound procurement decision-making and compliance with 45 CFR §95.610.

6. Project Status Report
A monthly summary of milestones, risks, funding request status, and progress.

Why it matters: Improves oversight and accountability by offering a concise, repeatable snapshot of progress, risks, and financial posture, enabling Medicaid agency leadership and CMS to make informed decisions.

7. MES Procurement Document Checklist
Aligns solicitations (RFPs/RFQs) with CMS expectations and federal regulations.

Why it matters: Helps ensure procurement packages fully align with CMS expectations, meets or includes citations for Conditions for Enhanced Funding, minimizing rework, reducing procurement delays, and setting Medicaid agencies up for smoother system certification.

8. Streamlined Modular Certification (SMC) Intake Form
The intake form for MES module certification, replacing prior EVV intake.

Why it matters: Clarifies certification evidence requirements early in the lifecycle, reducing ambiguity for vendors and states/territories and paving the way for efficient, timely CMS certification.

Why the change—and why now?

CMS’ goal is clear: reduce administrative burden, improve consistency, and accelerate federal review cycles. These templates create a common language for Medicaid agencies, vendors, and CMS—making compliance easier and oversight stronger.

Six months may sound like plenty of time, but consider the following as a sampling of what’s needed:

  • Active and upcoming MES deliverables (ORWs, project status reporting, APDs, and procurements) will need to transition to new templates before July 1
  • Procurements submitted to CMS must include a completed CMS Procurement Document Checklist demonstrating that the Medicaid Agency has addressed each CMS expectation within the procurement.
  • Operational reporting will require new data pipelines and project governance to help ensure accuracy of outcomes and metrics reporting.

Waiting will compress your compliance window and increase risks for non-compliance. Those who collaborate early and often with their CMS State Officer will benefit from smoother adoption and fewer surprises.

Your action plan

Here’s a practical roadmap to hit the July 1 deadline:

1. Mobilize now, develop your plan, and align with your State Officer

  • Form a cross-functional team (program, IT, finance, procurement, PMO/PgMO) and establish a shared understanding of the requirements, the team’s roles, and the frequency with which the group connects to stay aligned in your compliance efforts.
  • Create an inventory of APDs, active and planned procurements, forthcoming certifications, and status reports.
  • Develop your proposed timeline for transitioning to the new templates. More specifically, identify the APD Packages (i.e., APDs, MDBTs), Procurements, Project Status Reports, and Templates the agency believes can be transitioned in the very near term versus a future update.
  • Discuss your proposed plan for compliance with your Medicaid Agency’s CMS State Officer and align with their expectations. Lean into them as your partner for success.

2. Start small and stay aligned with your CMS State Officer

  • Consider strategies for implementation, such as:
    • Converting one APD and MDBT as a “pathfinder” to set the standard, before fully implementing your plan for adoption of the new APD and MDBT templates.
    • Piloting the ORW and Status Report templates internally for one to two projects to validate data sources and reporting cadence.
  • Align internally on how the AoA fits into your existing strategic planning and procurement processes, and draft an AoA for an upcoming decision to exercise the new format.
  • Regularly discuss your compliance efforts with your CMS State Officer, soliciting their feedback and guidance along the way.

3. Ensure alignment across templates

  • Map dependencies across templates (e.g., ORW ↔ APDs, AoAs within APDs ↔ procurements) to help ensure data, assumptions, and timelines remain consistent as templates are adopted.
  • Coordinate rollout sequencing so related templates are implemented together or in a logical order, reducing rework and misalignment across planning, reporting, and procurement activities.
  • Establish shared governance and review checkpoints to validate cross-template consistency before submission to CMS.

4. Scale and train

  • Expand beyond initial pilots to full-scale implementation of the new templates across APDs, ORWs, procurements, status reports, and related artifacts well in advance of the July 1 deadline.
  • Work across the enterprise, including program, IT, finance, procurement, PMO, and vendors, to ensure shared understanding, consistent data, and aligned execution as adoption scales.
  • Provide targeted, role-based training for agency staff and supporting vendors to reinforce expectations, clarify template interdependencies, and support consistent, high-quality submissions.
  • Continue proactive engagement with CMS throughout implementation by seeking clarifications, validating interpretations, and offering feedback to inform ongoing refinement and successful compliance.

Common pitfalls to avoid

  • Treating templates as a simple “copy‑paste” exercise, assuming that legacy content transfers over directly without evaluating whether requirements, processes, or context have changed and what new information needs to be added.
  • Underestimating the effort to stand up ORW reporting; ORW and SMC Intake Forms typically require multi-vendor engagement and adoption, as well as discussions with SMA team members.
  • Fragmenting ownership of adoption without a core team driving compliance with CMS expectations for template adoption, results in consistency issues.
  • Limiting early engagement with your CMS State Officer without ongoing conversations to review your plan, ask questions, and gather feedback.

How BerryDunn can help

We’ve been tracking these changes and are ready to help Medicaid agencies and vendors move quickly toward adoption by:

  • Conducting template walkthroughs and conversion sprints for APDs, MDBTs, status reporting, ORWs, and related artifacts.
  • Facilitating AoA development and reuse analysis to support informed decision-making.
  • Reviewing procurement materials to help ensure alignment with federal regulations and related APDs.
  • Supporting certification readiness through SMC Intake Form preparation and evidence mapping.
  • Delivering tailored training and practical playbooks aligned to agency staff and vendors.
  • Providing a portfolio management solution capable of supporting your strategic planning, procurement, implementation, and certification activities—as well as the critical reporting needed to support federal compliance (i.e., AoA, APDs, Status Reporting, ORW)

July 1, 2026, will be here before we know it! Medicaid agencies acting now have a higher likelihood of compliance success and will also achieve stronger governance and clearer outcomes. The clock’s ticking and we’re here to help!

Reach out to Amber Davis or Brennan Pouliot to learn more about BerryDunn can help you implement the CMS’ new MES templates.

Resources

Topics: CMS, Medicaid, MES

Related Industries

Related Services

Consulting

Related Professionals

BerryDunn experts and consultants

Phew! We did it—The Medicaid Enterprise Systems Conference (MESC) 2019 is one for the books! And, it was a great one. Here is my perspective on objectives and themes that will guide our work for the year.

Monday 

My day started in the fog—I live on an island in Maine, take a boat to get into Portland, and taxi to the airport. Luckily, I got to Portland, and, ultimately Chicago, on time and ready to go. 

Public Sector Technology Group (PSTG) meeting

At the PSTG meetings, we reviewed activities from the previous year and did some planning for the coming year. Areas for consideration included:

  • Modernization Schedule
  • Module Definitions
  • Request for Proposal (RFP) Requirements
  • National Association of State Procurement Officers

Julie Boughn, Centers for Medicare and Medicaid (CMS) Director, Data and Systems Group (DSG) introduced her new boss, Karen Shields, who is the Deputy Director for the Center for Medicaid and CHIP Services (CMCS) within CMS. Karen shared her words of wisdom and encouragement with us, while Julie reminded us that being successful in our work is about the people. CMS also underscored the goal of speeding up delivery of service to the Medicaid program and asking ourselves: “What is the problem we are trying to resolve?” 

CMS’ “You be the State” officer workshop

Kudos to CMS for creating this open environment of knowledge sharing and gathering input.  Areas for discussion and input included:

  • APD Processes
  • Outcomes-Based Certification
  • Increasing and Enhancing Accountability

Tuesday
Opening Plenary

I was very touched by the Girls Inc. video describing the mission of Girls Inc. to inspire girls to be strong, smart, and bold. With organizations like this, and our awareness and action, I am optimistic for the future. Thank you to NESCSO for including this in their opening program.

John Doerr, author of Measure What Matters: OKRs: The Simple Idea that Drives 10x Growth and famed investor, shared his thoughts on how to create focus and efficiency in what we do. Julie’s interview with him was excellent, and I appreciated how John’s Objectives and Key Results (OKR) process prompted Julie to create objectives for what we are trying to do. The objectives Julie shared with us:

  • Improve the quality of our services for users and other stakeholders 
  • Ensure high-quality data is available to manage the program and improve policy making 
  • Improve procurement and delivery of Medicaid technology projects

Sessions

The sessions were well attended and although I can't detail each specific session I attended, I will note that I did enjoy using the app to guide me through the conference. NESCSO has uploaded the presentations. 

Auxiliary meetings

Whether formal or informal, meetings are one of the big values of the conference—relationships are key to everyone’s success, and meeting with attendees in one-on-one environments was incredibly productive. 

Poster session

The poster sessions were excellent. States are really into this event, and it is a great opportunity for the MESC community to engage with the states and see what is going on in the Medicaid Enterprise space.

Wednesday

Some memorable phrases heard in the sessions:

  • Knowledge is power only if you share it
  • We are in this together and want the same outcomes, so let’s share more
  • Two challenges to partnering projects—the two “P”s—are purchasing and personnel
  • Don’t let perfection be the enemy of the good
  • Small steps matter
  • Sharing data is harder than it needs to be—keep in mind the reason for what you are doing

Our evening social event was another great opportunity to connect with the community at MESC and the view of Chicago was beautiful.

Julie Boughn challenged us to set a goal (objective) in the coming year, and, along with it, to target some key results in connection with that goal. Here are some of her conference reflections:

  • Awesome
    • Several State Program and Policy leaders participated at MESC—impressed with Medicaid Director presence and participation
    • Smaller scoped projects are delivering in meeting the desired improved speed of delivery and quality
    • Increased program-technology alignment
  • Not so awesome
    • Pending state-vendor divorces
    • Burden of checklists and State Self-Assessments (SS-As)—will have something to report next year
    • There are still some attempts at very large, multi-year replacement projects—there is going to be a lot of scrutiny on gaining outcomes. Cannot wait five years to change something.

OKRs and request for states and vendors

  • Objective: Improve the quality of services for our users and other stakeholders
    • Key Result (KR): Through test results and audits, all States and CMS can state with precision, the overall accuracy of Medicaid eligibility systems.
    • KR: 100% of State electronic visit verification (EVV) systems are certified and producing annual performance data.
    • KR: 100% of States have used CMS-required testing guidance to produce testing results and evidence for their eligibility systems.
  • Objective: Ensure high-quality data is available to manage the program and improve policy making
    • KR: Transformed Medicaid Statistical Information System (T-MSIS) data is of sufficient quality that it is used to inform at least one key national Medicaid policy decision that all states have implemented.
    • KR:  Eliminate at least two state reporting requirements because T-MSIS data can be used instead.
    • KR: At least five states have used national or regional T-MSIS data to inform their own program oversite and/or policy-making decisions.
  • Objective: Improve how Medicaid technology projects are procured and delivered
    • KR: Draft standard language for outcomes metrics for at least four Medicaid business areas.
    • KR:  Five states make use of the standard NASPO Medicaid procurement.
    • KR:  CMS reviews of RFPs and contracts using NASPO vehicle are completed within 10 business days.
    • KR:  Four states test using small incremental development phases for delivery of services.
  • Request: Within 30 days, states/vendors will identify at least one action to take to help us achieve at least one of the KRs within the next two years.

Last thoughts

There is a lot to digest, and I am energized to carry on. There are many follow-up tasks we all have on our list. Before we know it, we’ll be back at next year’s MESC and can check in on how we are doing with the action we have chosen to help meet CMS’s requirements. See you in Boston!

Article
MESC 2019―Reflections and Daily Recap

Editor’s note: If you are a state government CFO, CIO, project or program manager, this blog is for you. 

This is the second blog post in the blog series: “Procuring Agile vs. Non-Agile Service”. Read the first blog. This blog post demonstrates the differences in Stage 1: Plan Project in the five stages of procuring agile vs. non-agile services.

Overview of Procurement Process for Agile vs. Non-Agile IT Services

What is important to consider in agile procurement?

Here are some questions that can help focus the planning for procurement of IT services for agile vs. non-agile projects.

 

Plan Project Considerations for Agile vs. Non-Agile IT Services

Why are these considerations important?

When you procure agile IT services, you can define the scope of your procurement around a vision of what your organization intends to become, as opposed to being restricted to an end-date for a final delivery.

In an agile project, you get results iteratively; this allows you to constantly reassess requirements throughout the project, including the project plan, the guiding principles, and the project schedule. Your planning is not restricted to considering the effect of one big result at the end of the project schedule. Instead, your plan allows for sequencing of changes and improvements that best reflect the outcomes and priorities your organization needs. 

Since planning impacts the people-aspect of your strategy, it is important to consider how various teams and stakeholders will provide input, and how you will make ongoing communication updates throughout the project. With an agile procurement project, your culture will shift, and you will need a different approach to planning, scheduling, communicating, and risk management. You need to communicate daily, allowing for reviewing and adjusting priorities and plans to meet project needs. 

How do you act on these considerations?

A successful procurement plan of agile IT services should include the following steps:

  1. Develop a project charter and guiding principles for the procurement that reflect a vision of how your organization’s teams will work together in the future
  2. Create a communication plan that includes the definition of project success and communicates project approach
  3. Be transparent about the development strategy, and outline how iterations are based on user needs, that features will be re-prioritized on an ongoing basis, and that users, customers, and stakeholders are needed to help define requirements and expected outcomes
  4. Provide agile training to your management, procurement, and program operation teams to help them accept and understand the project will present deliverables in iterations, to include needed features, functionality and working products
  5. Develop requirements for the scope of work that align with services and outcomes you want, rather than documented statements that merely map to your current processes 

What’s next? 

Now that you have gained insight into the approach to planning an agile project, consider how you may put this first stage into practice in your organization. Stay tuned for guidance on how to execute the second stage of the procurement process—how to draft the RFP. Our intention is that, following this series, your organization will better understand how to successfully procure and implement agile services. If you have questions or comments, please contact our team.
 

Article
Plan agile projects: Stage 1

Read this if you are a State Medicaid Director, State Medicaid Chief Information Officer, State Medicaid Project Manager, or State Procurement Officer—or if you work on a State Medicaid Enterprise System (MES) certification effort.

Measuring performance of Medicaid Enterprise Systems (MES) is emerging as the next logical step in moving Medicaid programs toward modularity. As CMS continues to refine and implement outcomes-based modular certification, it is critical that states adapt to this next step in order to continue to meet CMS funding requirements.

This measurement, in terms of program outcomes, presents a unique set of challenges, many of which a state may not have considered before. A significant challenge is determining how and where to begin measuring program outcomes―to meet it, states can leverage a trusted, independent partner as they undertake an outcomes-based effort.

Outcomes-based planning can be thought of as a three-step process. First, and perhaps most fundamental, is to define outcomes. Second, you need to determine what measurements will demonstrate progress toward achieving those outcomes. And the final step is to create reporting measurements and their frequency. Your independent partner can help you answer these critical questions and meet CMS requirements efficiently by objectively guiding you toward realizing your goals.

  1. Defining Outcomes
    When defining an outcome, it is important to understand what it is and what it isn’t. An outcome is a benefit or added value to the Medicaid program. It is not an output, which is a new or enhanced function of a new MES module. An output is the product that supports the outcome. For example, the functionality of a new Program Integrity (PI) module represents an output. The outcome of the new PI module could be that the Medicaid program continuously improves based on data available because of the new PI module. Some outcomes may be intuitive or obvious. Others may not be as easy to articulate. Regardless, you need to direct the focus of your state and solution vendor teams on the outcome to uncover what the underlying goal of your Medicaid program is.
     
  2. Determining Measurements
    The second step is to measure progress. Well-defined Key Performance Indicators (KPIs) will accurately capture progress toward these newly defined outcomes. Your independent partner can play a key role by posing questions to help ensure the measurements you consider align with CMS’ goals and objectives. Additionally, they can validate the quality of the data to ensure accuracy of all measurements, again helping to meet CMS requirements.
     
  3. Reporting Measurements
    Finally, your state must decide how―and how often―to report on outcomes-based measurements. Your independent partner can collaborate with both your state and CMS by facilitating conversations to determine how you should report, based on a Medicaid program’s nuances and CMS’ goals. This can help ensure the measurements (and support information) you present to CMS are useful and reliable, giving you the best chance for attaining modular certification.

Are you considering an outcomes-based CMS modular certification, or do you have questions about how to best leverage an independent partner to succeed with your outcomes-based modular certification effort? BerryDunn’s extensive experience as an independent IV&V and Project Management Office (PMO) partner includes the first pilot outcomes-based certification effort with CMS. Please visit our IV&V and certification experts at our booth at MESC 2019 or contact our team now.

Article
Three steps to measure Medicaid Enterprise Systems outcomes

Read this if you are a State Medicaid Director, State Medicaid Chief Information Officer, State Medicaid Project Manager, or State Procurement Officer.

As CMS moves away from the monolithic Medicaid Management Information System (MMIS) toward an outcomes-based approach that includes a modular Medicaid Enterprise System (MES), there is now more emphasis on system integration (SI). 

In the August 16, 2016 letter, State Medicaid Director (SMD) #16-010, CMS clarified the role of the system integrator (SI) by stating:

CMS envisions a discrete role for the system integrator (SI) in each state, with specific focus on ensuring the integrity and interoperability of the Medicaid IT architecture and cohesiveness of the various modules incorporated into the Medicaid enterprise. 

While the importance of the SI role is apparent, not all states have the resources to build the SI capability within their own organizations. Some state Medicaid IT teams try to solve this by delegating management roles to vendors or contractors. This approach has various risks. A state could lose:

  • Institutional knowledge, as vendors and contractors transition off the project
  • Control of governance, oversight, and leadership
  • The ability to enforce contractual requirements across each vendor, especially the SI

In addition, the ramifications of loss of state accountability can have wide-reaching implementation, operational, and financial impacts, including:

  • The loss of timely decision making, causing projects to fall behind schedule
  • State-specific policy needs not being met, impacting how the MMIS functions in production 
  • Poor integration into the state-specific Operation and Maintenance (O&M) support model, increasing the state’s portion of long-term O&M costs
  • Inefficient and ineffective contract management of each module vendor and contractor (including the SI), possibly leading to unneeded change requests and cost overruns
  • Lack of coordination with the state’s business or IT roadmap initiatives (i.e., system consolidation or cloud migration vendor/approach), possibly leading to rework and missed opportunities to reduce cost or improve interoperability 

Apply strong governance and IV&V to tackle risks

Because the SI vendor is responsible for the integration of multiple modules across multiple vendors, you may consider delegating oversight of module vendors to the SI vendor. 

The major benefit states get from using the SI vendor is efficiency. Having your vendor as the central point of contact can quickly resolve technical issues, while allowing easy coordination of project tasks across each module vendor on a continual basis. 

If you choose to use a vendor for the SI role, establish safeguards and governance to make sure your goals are being met:

  • Build a project-specific governance model (executive committee [EC]) to oversee the vendors and the project
  • Establish a regular meeting cadence for the EC to allow for status updates on milestones and discuss significant project risks and issues 
  • Allocate state resources into project leadership roles (i.e., project manager, vendor contract manager, security lead, testing/Quality Assurance lead, etc.)
  • Conduct regular (weekly) SI status meetings to track progress and address risks and issues 

You also need a strong, involved governance structure that includes teams of state senior leadership, state program managers, SI vendor engagement/contract managers, and Independent Verification and Validation (IV&V) vendors. By definition, one responsibility of IV&V is to identify and monitor project risks and issues that could arise from a lack of independence. 

Your governance teams can debate decisions and disputes, risks and issues, and federal compliance issues with their vendors to define direction and action plans. However, a state representative within these teams should always make the final management decisions, approve all SI scope items and changes, and approve all contractual deliverables from each vendor or contractor.

Your state staff (business and IT) provides project management decision, business needs, requirements (functional and non-functional), policy guidance, and continuity as the vendors and/or contractors change over time. 

The conclusion? In order to be successful, you must retain certain controls and expertise to deploy and operate a successful MMIS system. Our consultants understand the need to keep you in control of managing key portions of implementation projects/programs and operational tasks. If you have questions, please contact BerryDunn’s Medicaid team.  
 

Article
Risks when using vendors to manage Medicaid system implementation projects

Read this if you are a state Medicaid Director, State Medicaid Chief Information Officer, State Medicaid Project Manager, or State Procurement Officer.

When I was growing up, my dad would leave the Bureau of Motor Vehicles or hang up the phone after talking with the phone company and say sarcastically, “I’m from the government (or the phone company) and I’m here to help you. Yeah, right.” I could hear the frustration in his voice. As I’ve gotten older, I understand the hassle of dealing with bureaucracy, where the red tape can make things more difficult than they need to be, and where customers don’t come first. It doesn’t have to be that way.

In my role performing Independent Verification and Validation (IV&V) at BerryDunn, I hear the same skepticism in the voices of some of my clients. I can hear them thinking, “Let me get this straight… I’m spending millions of dollars to replace my old Medicaid Management Information System (MMIS), and the Centers for Medicare and Medicaid Services (CMS) says I have to hire an IV&V consultant to show me what I am doing wrong? I don’t even control the contract. You’re here to help me? Yeah, right.” Here are some things to assuage your doubt. 

Independent IV&V―what they should do for you and your organization

An independent IV&V partner that is invested in your project’s success can:

  • Enhance your system implementation to help you achieve compliance
  • Help you share best practice experience in the context of your organization’s culture to improve efficiency in other areas
  • Assist you in improving your efficiency and timeliness with project management capabilities.

Even though IV&V vendors are federally mandated from CMS, your IV&V vendor should also be a trusted partner and advisor, so you can achieve compliance, improve efficiency, and save time and effort. 

Not all IV&V vendors are equal. Important things to consider:

Independence―independent vendors are a good place to start, as they are solely focused on your project’s success. They should not be selling you software or other added services, push vendor affiliations, or rubber stamp CMS, nor the state. You need a non-biased sounding board, a partner willing to share lessons learned from experience that will help your organization improve.

Well-rounded perspective―IV&V vendors should approach your project from all perspectives. A successful implementation relies on knowledge of Medicaid policy and processes, Medicaid operations and financing, CMS certification, and project management.

“Hello, we are IV&V from BerryDunn, and we are here to help.”

BerryDunn offers teams that consist of members with complementary skills to ensure all aspects of your project receive expert attention. Have questions about IV&V? Contact our team.
 

Article
We're IV&V and we are here to help you improve your Medicaid organization

As the Project Management Body of Knowledge® (PMBOK®) explains, organizations fall along a structure and reporting spectrum. On one end of this spectrum are functional organizations, in which people report to their functional managers. (For example, Finance staff report to a Finance director.) On the other end of this spectrum are projectized organizations, in which people report to a project manager. Toward the middle of the spectrum lie hybrid—or matrix—organizations, in which reporting lines are fairly complex; e.g., people may report to both functional managers and project managers. 

Problem: Weak Matrix Medicaid System Vendors

This brings us to weak matrix organizations, in which functional managers have more authority than project managers. Many Medicaid system vendors happen to fall into the weak matrix category, for a number of different reasons. Yet the primary factor is the volume and duration of operational work—such as provider enrollment, claims processing, and member enrollment—that Medicaid system vendors perform once they exit the design, development, and implementation (DDI) phase.

This work spans functional areas, which can muddy the reporting waters. Without strong and clear reporting lines to project managers, project success can be seriously (and negatively) affected if the priorities of the functional leads are not aligned with those of the project. And when a weak matrix Medicaid system vendor enters a multi-vendor environment in which it is tasked with implementing a system that will serve multiple departments and bureaus within a state government, the reporting waters can become even muddier.


Solution: Using a Project Management Office (PMO) Vendor

Conversely, consulting firms that provide Project Management Office (PMO) services to government agencies tend to be strong matrix organizations, in which project managers have more authority over project teams and can quickly reallocate team members to address the myriad of issues that arise on complex, multi-year projects to help ensure project success. PMOs are also typically experienced at creating and running project governance structures and can add significant value in system implementation-related work across government agencies.

Additional benefits of a utilizing a PMO vendor include consistent, centralized reporting across your portfolio of projects and the ability to quickly onboard subject matter expertise to meet program and project needs. 
For more in-depth information on the benefits of using a PMO on state Medicaid projects, stay tuned for my second blog in this series. In the meantime, feel free to send your PMO- or Medicaid-related questions to me. 
 

Article
The power of the PMO: Fixing the weak matrix

As your organization works to modernize and improve your Medicaid Enterprise System (MES), are you using independent verification and validation (IV&V) to your advantage? Does your relationship with your IV&V provider help you identify high-risk project areas early, or provide you with an objective view of the progress and quality of your MES modernization initiative? Maybe your experience hasn’t shown you the benefits of IV&V. 

If so, as CMS focuses on quality outcomes, there may be opportunities for you to leverage IV&V in a way that can help advance your MES to increase the likelihood of desired outcomes for your clients. 

According to 45 Code of Federal Regulations (CFR) § 95.626, IV&V may be required for Advanced Planning Document (APD) projects that meet specific criteria. That said, what is the intended role and benefit of IV&V? 

To begin, let’s look at the meaning of “verification” and “validation.” The Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard for Software Verification and Validation (1012-1998) defines verification as, “confirmation of objective evidence that the particular requirements for a specific intended use are fulfilled.” Validation is “confirmation of objective evidence that specified requirements have been fulfilled.” 

Simply put, verification and validation ensure the right product is built, and the product is built right. 
As an independent third party, IV&V should not be influenced by any vendor or software application. This objectivity means IV&V’s perspective is focused on benefiting your organization. This support includes: 

  • Project management processes and best practices support to help increase probability of project success
  • Collaboration with you, your vendors, and stakeholders to help foster a positive and efficient environment for team members to interact 
  • Early identification of high-risk project areas to minimize impact to schedule, cost, quality, and scope 
  • Objective examination of project health in order for project sponsors, including the federal government, to address project issues
  • Impartial analysis of project health that allows state management to make informed decisions 
  • Unbiased visibility into the progress and quality of the project effort to increase customer satisfaction and reduce the risk and cost of rework
  • Reduction of errors in delivered products to help increase productivity of staff, resulting in a more efficient MES 

Based on our experience, when a trusted relationship exists between state governments and IV&V, an open, collaborative dialogue of project challenges—in a non-threatening manner—allows for early resolution of risks. This leads to improved quality of MES outcomes.    

Is your IV&V provider helping you advance the quality of your MES? Contact our team.

Article
Leveraging IV&V to achieve quality outcomes