Implementing a New Offender Management System in a Secure Correctional Facility

10.06.26 /

Individuals working in corrections are aware that technology access and use have generally been limited for those on the front lines. Traditionally, correctional staff had limited access to computers and the internet within offender housing units, largely due to valid security concerns and an established correctional culture that discouraged technological access in areas with high offender populations. Despite this historical pattern, the need to streamline operations and improve overall efficiency and effectiveness has driven a shift in technology use in the corrections space. For many organizations, this has involved selection and implementation of a new offender management system (OMS), designed to meet the needs of the ever-evolving corrections space.

In my prior role as a Deputy Warden, I was integrally involved in the implementation of a new OMS, which served all the facilities within our state. Although this change was initially viewed myopically as simply moving to a new OMS, I quickly discovered, as did many of my colleagues, that this was a much broader and more necessary endeavor. At the time the project began, we were using outdated systems that did not communicate with each other. Our legacy platform had stopped receiving system updates, and staff were maintaining their own spreadsheets to track basic offender information to complete their job duties. Additionally, most correctional staff had limited computer access, which often required them to leave their post to go to a computer lab to submit their time sheets and complete any required reports.

Based on recognition of various operational efficiency obstacles, we knew we needed a new OMS. To that end, our goal was simple: to give frontline staff unprecedented real-time access to offender information so they could perform their jobs safely and more efficiently and effectively. That goal, though simple, was not easy to accomplish, because implementing new software in a correctional environment is more complicated than installing software in most other industries. The process of implementing a new OMS required us to maintain strict security standards while introducing technology into areas where it had not existed before. That involved integrating systems into a secure environment within an offender housing unit and taking specific steps to prohibit any possible unauthorized access to the OMS.

To address access concerns, we worked closely with frontline staff and thoughtfully considered our physical plant. We installed security cages around office desks; deployed hardened, secure workstations; and invested heavily in infrastructure, running new network cable and electrical lines to support both current operations and future growth. Throughout this process, we solicited and received feedback from correctional officers and made several changes to our plans along the way, including installing automatic integrated locks on the security gate. Once we established a secure environment within the housing unit, we installed the computers—which provided real-time access to the new OMS—and the impact was immediate.

In the past, frontline staff had relied on manual logs, institutional knowledge, or the need to call the control unit to receive various offender information. The new OMS changed those processes in a significant way. Through role-based access controls, secure networks, and hardened workstations, officers gained appropriate, controlled access to data at their fingertips. This included access to offender locations, work assignments, holds, custody levels, and conduct history. Officers could review assault flags, see pending conduct reports, and verify classification levels directly from their assigned posts. Incident and conduct reports could be completed at their post and no longer required backfill relief to get paperwork completed on time. Communication improved across the organization because officers now had regular access to email, policy updates, and facility-wide messaging at their post. Operational awareness, efficiency, and overall effectiveness increased, and so did overall safety.

Training was a crucial factor in the new OMS rollout, as is common with any new policies or procurement implementations; however, the magnitude of implementing the new OMS was at another level, requiring significant effort and coordination. Ultimately, to improve the likelihood of success for this rollout, we implemented a variety of training methods, including a train-the-trainer model, role-specific training, and providing staff access to an OMS test environment prior to the go-live date. Through this process, we concluded that giving staff advanced access to the OMS test environment was one of the most impactful steps we took, especially for hesitant or resistant staff. This process provided them with an opportunity to test the system using real-world scenarios. It reduced resistance, addressed fear, and replaced uncertainty with confidence. When staff were able to see how the system would help them perform their jobs more efficiently, they quickly recognized the value in moving to the new system, and they embraced it.

In the short term, following the OMS implementation, we saw better decision-making, more streamlined workflows, and improved communication across departments. As our use of the system continued, we noted the opportunities for advanced analytics, better risk identification, and future expansion of digital tools for both staff and offenders. Despite these benefits, the most important outcome wasn’t a technical one. The most valuable outcome we achieved involved empowering our staff and equipping them with modern tools to assist them with their job duties, resulting in a more autonomous and productive workforce.

The success of a new OMS does not depend on the technology alone. It requires alignment between people, processes, and the systems put into place. This does not happen by accident; it demands a thoughtful and intentional approach. When the planning and implementation efforts allow those three elements to come together, the result is a safer correctional environment, more efficient operations, and frontline staff who have the information they need to make the right decisions at the right time.

If you would like to hear more about my experience with implementing a new OMS, feel free to reach out.

How BerryDunn can help

Modernizing your corrections technology platforms is a daunting undertaking. Our experienced team has helped organizations across the country align their modernization efforts with industry best practices and standards. Learn more about our team and services.

Related Services

Consulting

Information Systems

Related Professionals

BerryDunn experts and consultants

There’s a good chance that your organization is in the position of needing to do more with less under the strain of staffing constraints and competing initiatives. With fewer resources to work with, you’ll need to be persuasive to get the green light on new enterprise technology initiatives. To do that, you need to present decision makers with well-thought-out and targeted business cases that show your initiative will have impact and will be successful. Yet developing such a business case is no walk in the park. Perhaps because our firm has its roots in New England, we sometimes compare this process to leading a hiking trip into the woods—into the wild. 

Just as in hiking, success in developing a business case for a new initiative boils down to planning, preparation, and applying a few key concepts we’ve learned from our travels. 

Consensus is critical when planning new technology initiatives

Before you can start the hike, everyone has to agree on some fundamentals: 

Who's going? 

Where are we going? 

When do we go and for how long? 

Getting everyone to agree requires clear communication and, yes, even a little salesmanship: “Trust me. The bears aren’t bad this time of year.” The same principle applies in proposing new technology initiatives; making sure everyone has bought into the basic framework of the initiative is critical to success.

Although many hiking trips involve groups of people similar in age, ability, and whereabouts, for your business initiative you need to communicate with diverse groups of colleagues at every level of the organization. Gaining consensus among people who bring a wide variety of skills and perspectives to the project can be complex.

To gain consensus, consider the intended audiences of your message and target the content to what will work for them. It should provide enough information for executive-level stakeholders to quickly understand the initiative and the path forward. It should give people responsible for implementation or who will provide specific skills substantive information to implement the plan. And remember: one of the most common reasons projects struggle to meet their stated objectives (and why some projects never materialize to begin with), is a lack of sponsorship and buy-in. The goal of a business case is to gain buy-in before project initiation, so your sponsors will actively support the project during implementation. 

Set clear goals for your enterprise technology project 

It’s refreshing to take the first steps, to feel that initial sense of freedom as you set off down the trail. Yet few people truly enjoy wandering around aimlessly in the wilderness for an extended period of time. Hikers need goals, like reaching a mountain peak or seeing famous landmarks, or hiking a predetermined number of miles per day. And having a trail guide is key in meeting those goals. 

For a new initiative, clearly define goals and objectives, as well as pain points your organization wishes to address. This is critical to ensuring that the project’s sponsors and implementation team are all on the same page. Identifying specific benefits of completing your initiative can help people keep their “eyes on the prize” when the project feels like an uphill climb.

Timelines provide additional detail and direction—and demonstrate to decision makers that you have considered multiple facets of the project, including any constraints, resource limitations, or scheduling conflicts. Identifying best practices to incorporate throughout the initiative enhances the value of a business case proposition, and positions the organization for success. By leveraging lessons learned on previous projects, and planning for and mitigating risk, the organization will begin to clear the path for a successful endeavor. 

Don’t compromise on the right equipment

Hiking can be an expensive, time-consuming hobby. While the quality of your equipment and the accuracy of your maps are crucial, you can do things with limited resources if you’re careful. Taking the time to research and purchase the right equipment, (like the right hiking boots), keeps your fun expedition from becoming a tortuous slog. 

Similarly, in developing a business case for a new initiative, you need to make sure that you identify the right resources in the right areas. We all live with resource constraints of one sort or another. The process of identifying resources, particularly for funding and staffing the project, will lead to fewer surprises down the path. As many government employees know all too well, it is better to be thorough in the budget planning process than to return to authorizing sources for additional funding while midstream in a project. 

Consider your possible outcomes

You cannot be too singularly focused in the wild; weather conditions change quickly, unexpected opportunities reveal themselves, and being able to adapt quickly is absolutely necessary in order for everyone to come home safely. Sometimes, you should take the trail less traveled, rest in the random lean-to that you and your group stumble upon, or go for a refreshing dip in a lake. By focusing on more than just one single objective, it often leads to more enjoyable, safe, and successful excursions.

This type of outlook is necessary to build a business case for a new initiative. You may need to step back during your initial planning and consider the full impact of the process, including on those outside your organization. For example, you may begin to identify ways in which the initiative could benefit both internal and external stakeholders, and plan to move forward in a slightly new direction. Let’s say you’re building a business case for a new land management and permitting software system. Take time to consider that this system may benefit citizens, contractors, and other organizations that interact with your department. This new perspective can help you strengthen your business case. 

Expect teamwork

A group that doesn’t practice teamwork won’t last long in the wild. In order to facilitate and promote teamwork, it’s important to recognize the skills and contributions of each and every person. Some have a better sense of direction, while some can more easily start campfires. And if you find yourself fortunate enough to be joined by a truly experienced hiker, make sure that you listen to what they have to say.

Doing the hard work to present a business case for a new initiative may feel like a solitary action at times, but it’s not. Most likely, there are other people in your organization who see the value in the initiative. Recognize and utilize their skills in your planning. We also suggest working with an experienced advisor who can leverage best practices and lessons learned from similar projects. Their experience will help you anticipate potential resistance and develop and articulate the mitigation strategies necessary to gain support for your initiative.

If you have thoughts, concerns, or questions, contact our team. We love to discuss the potential and pitfalls of new initiatives, and can help prepare you to head out into the wild. We’d love to hear any parallels with hiking and wilderness adventuring that you have as well. Let us know! 

BerryDunn’s local government consulting team has the experience to lead technology planning initiatives and develop actionable plans that help you think strategically and improve service delivery. We partner with you, maintaining flexibility and open lines of communication to help ensure that your team has the resources it needs.

Our team has broad and deep experience partnering with local government clients across the country to modernize technology-based business transformation projects and the decision-making and planning efforts. Our expertise includes software system assessments/planning/procurement and implementation project management; operational, management, and staffing assessments; information security; cost allocation studies; and data management.  

Article
Into the wild: Building a business case for a new enterprise technology project

The BerryDunn Recovery Advisory Team has compiled this guide to COVID-19 consulting resources for state and local government agencies and higher education institutions.

We have provided a list of our consulting services related to data analysis, CARES Act funding and procurement, and legislation and policy implementation. Many of these services can be procured via the NASPO ValuePoint Procurement Acquisition Support Services contract.

READ THE GUIDE NOW

We're here to help.
If you have any questions, please contact us at info@berrydunn.com

Article
COVID-19 consulting resources

Read this if your organization, business, or institution has leases and you’ve been eagerly awaiting and planning for the implementation of the new lease standards.

Ready? Set? Not yet. As we have prepared for and experienced delays related to Financial Accounting Standards Board (FASB) Accounting Standards Codification Topic 842, Leases, we thought the time had finally come for implementation. With the challenges that COVID-19 has brought to everyone, the FASB recognizes the significant impact COVID-19 has brought to commercial businesses and not-for-profits and is proposing a one-year delay in implementation, as described in this article posted to the Journal of Accountancy: FASB effective date delay proposals to include private company lease accounting.

But what about lease concessions? We all recognize many lessors are making concessions due to the pandemic. Under current guidance in Topics 840 and 842, changes to lease contracts that were not included in the original lease are generally accounted for as lease modifications and, therefore, a separate contract. This would require remeasurement of the new lease contract and related right-of-use asset. FASB recognized this issue and has published a FASB Staff Questions and Answers (Q&A) Document,  Topic 842 and Topic 840: Accounting for Lease Concessions Related to the Effects of the COVID-19 Pandemic. Under this new guidance, if lease concessions are made relating to COVID-19, entities do not need to analyze each contract to determine if a new contract has been entered into, and will have the option to apply, or not to apply, the lease modification provisions of Topics 840 and 842.

Implementation of the lease accounting standard will most likely be delayed for Governmental Accounting Standards Board (GASB) entities as well. On April 15, 2020, the GASB issued an exposure draft that would delay most GASB statements and implementation guides due to be implemented for fiscal years 2019 and later. Most notably, this includes Statement 84, Fiduciary Activities, and Statement 87, Leases. Comments on the proposal will be accepted through April 30, and the board plans to consider a final statement for issuance on May 8. More information may be found in this article from the Journal of Accountancy: GASB proposes postponing effective dates due to pandemic.

More information

Whether you are a FASB or GASB entity, you can expect a delay in the implementation of the lease standard. If you have questions, please contact a member of our financial statement audit team. For other COVID-19 related resources, please refer to BerryDunn’s COVID-19 Resources Page.

Article
FASB and GASB news: Postponement of the lease accounting standards

Read this if you are a police executive, city/county administrator, or elected government official, responsible for a law enforcement agency. 

“We need more cops!”  

Do your patrol officers complain about being short-staffed or too busy, or that they are constantly running from call to call? Does your agency struggle with backed-up calls for service (CFS) or lengthy response times? Do patrol staff regularly find themselves responding to another patrol area to handle a CFS because the assigned officer is busy on another call? Are patrol officers denied leave time or training opportunities because of staffing issues? Does the agency routinely use overtime to cover predictable shift vacancies for vacations, holidays, or training? 

If one or more of these concerns sound familiar, you may need additional patrol resources, as staffing levels are often a key factor in personnel deployment challenges. Flaws in the patrol schedule design may also be responsible, as they commonly contribute to reduced efficiency and optimal performance, and design issues may be partially responsible for some of these challenges, regardless of authorized staffing levels.
 
With community expectations at an all-time high, and resource allocations remaining relatively flat, many agencies have growing concerns about managing increasing service volumes while controlling quality and building/maintaining public trust and confidence. Amid these concerns, agencies struggle with designing work schedules that efficiently and optimally deploy available patrol resources, as patrol staff become increasingly frustrated at what they consider a lack of staff.

The path to resolving inefficiencies in your patrol work schedule and optimizing the effective deployment of patrol personnel requires thoughtful consideration of several overarching goals:

  • Reducing or eliminating predictable overtime
  • Eliminating peaks and valleys in staffing due to scheduled leave
  • Ensuring appropriate staffing levels in all patrol zones or beats
  • Providing sufficient staff to manage multiple and priority CFS in patrol zones or beats
  • Satisfying both operational and staff needs, including helping to ensure a proper work/life balance and equitable workloads for patrol staff

Scheduling alternatives

One common design issue that presents an ongoing challenge for agencies is the continued use of traditional, balanced work schedules, which spread officer work hours equally over the year. Balanced schedules rely on over-scheduling and overtime to manage personnel allocation and leave needs and, by design, are very rigid. Balanced work schedules have been used for a very long time, not because they’re most efficient, but because they’re common, familiar, and easily understood―and because patrol staff are comfortable with them (and typically reluctant to change). However, short schedules offer a proven alternative to balanced patrol work schedules, and when presented with the benefits of an alternative work schedule design (e.g., increased access to back-up, ease of receiving time off or training, consistency in staffing, less mandatory overtime), many patrol staff are eager to change.

Short schedules

Short schedules involve a more contemporary design that includes a flexible approach that focuses on a more adaptive process of allocating personnel where and when they are needed. They are significantly more efficient than balanced schedules and, when functioning properly, they can dramatically improve personnel deployments, bring continuity to daily staffing, and reduce overtime, among other operational benefits. Given the current climate, most agencies are unlikely to receive substantial increases in personnel allocations. If that is true of your agency, it may be time to explore the benefits of alternative patrol work schedules.

A tool you can use

Finding scheduling strategies that work in this climate requires an intentional approach, customized to your agency’s characteristics (e.g., staffing levels, geographic factors, crime rates, zone/beat design, contract/labor rules). To help guide you through this process, BerryDunn has developed a free tool for evaluating patrol schedules. Click here to measure your patrol schedule against key design components and considerations.

If you are curious about alternative patrol work schedules, our dedicated justice and public Safety consultants are available to discuss your organization’s needs.

Article
Efficient police patrol work schedules―By design

Law enforcement, courts, prosecutors, and corrections personnel provide many complex, seemingly limitless services. Seemingly is the key word here, for in reality these personnel provide a set number of incredibly important services.

Therefore, it should surprise no one that justice and public safety (J&PS) IT departments should also provide a well-defined set of services. However, these departments are often viewed as parking lots for all technical problems. The disconnect between IT and other J&PS business units often stems from differences in organizational culture and structure, and differing department objectives and goals. As a result, J&PS organizations often experience misperception between business units and IT. The solution to this disconnect and misperception? Defining IT department services.

The benefits of defined IT services

  1. Increased business customer satisfaction. Once IT services align with customer needs, and expectations are established (e.g., service costs and service level agreements), customers can expect to receive the services they agreed to, and the IT department can align staff and skill levels to successfully meet those needs.
  2. Improved IT personnel morale. With clear definition of the services they provide to their customers, including clearly defined processes for customers to request those services, IT personnel will no longer be subject to “rogue” questions or requests, and customers won’t be inclined to circumvent the process. This decreases IT staff stress and enables them to focus on their roles in providing the defined services. 
  3. Better alignment of IT services to organizational needs. Through collaboration between the business and IT organizations, the business is able to clearly articulate the IT services that are, and aren’t, required. IT can help define realistic service levels and associated services costs, and can align IT staff and skills to the agreed-upon services. This results in increased IT effectiveness and reduced confusion regarding what services the business can expect from IT.
  4. More collaboration between IT and the organization. The collaboration between the IT and business units in defining services results in an enhanced relationship between these organizations, increasing trust and clarifying expectations. This collaborative model continues as the services required by the business evolve, and IT evolves to support them.
  5. Reduced costs. J&PS organizations that fail to strategically align IT and business strategy face increasing financial costs, as the organization is unable to invest IT dollars wisely. When a business doesn’t see IT as an enabler of business strategy, IT is no longer the provider of choice—and ultimately risks IT services being outsourced to a third-party vendor.

Next steps
Once a J&PS IT department defines its services to support business needs, it then can align the IT staffing model (i.e., numbers of staff, skill sets, roles and responsibilities), and continue to collaborate with the business to identify evolving services, as well as remove services that are no longer relevant. Contact us for help with this next step and other IT strategies and tactics for justice and public safety organizations.

Article
The definition of success: J&PS IT departments must define services

Your government agency just signed the contract to purchase and implement a shiny new commercial off-the-shelf (COTS) software to replace your aging legacy software. The project plan and schedule are set; the vendor is ready to begin configuration and customization tasks; and your team is eager to start the implementation process.

You are, in a word, optimistic. But here comes the next phase of the project—the gap analysis, in which your project team and the vendor’s project team test the new software to see how well it fulfills your requirements. Spending sufficient time and energy on the gap analysis increases the likelihood the resulting software is configured to support the desired workflows and processes of the agency, while taking advantage of the software’s features and benefits. Yet this phase can be stressful because it will identify some gaps between what you want and what the software can provide.

While some of the gaps may be resolved by simple adjustments to software configuration, others may not—and can result in major issues impacting project scope, schedule, and/or cost. How do you resolve these major gaps?

Multiple Methods. Don’t let your optimism die on the vine. There are, in fact, multiple ways to address major gaps to keep you on schedule and on budget. They include:

Documenting a change request through a formal change control process. This will likely result in the vendor documenting the results of the new project scope. This, in turn, may impact the project’s schedule and cost. It promotes best practice by formally documenting approved changes to project scope, including any impact on schedule and cost. However, the change request process may take longer than you may originally anticipate, as it includes:

• Documenting the proposed change
• Scoping the change, including the impact on cost and schedule
• Review of the proposed scope change with the project team and vendor
• Final approval of the change before the vendor can begin work

Collaborating with the vendor on a solution that fits within the confines of the selected software. With no actual customization required, this may result in a functionality compromise, and may also involve compromise by the project team and the vendor. However, it does not require a formal process to document and approve a change in scope, schedule or cost, since there are no impacts on these triple constraints.

Collaborating with the vendor and internal project stakeholders to redefine business processes. This may or may not result in a change request. It also promotes best practice, as the business processes become more efficient, and are supported by the selected software product without customization. This will require a focus on organizational change management, since the resulting processes are not reflective of the “way things are done today.”

Accepting the gap—and doing nothing. If the gap has little or no impact on business process efficiency or effectiveness, this method is likely the least impactful on the project, as there are no changes to scope, schedule, or cost. However, the concept of “doing nothing” to address the gap may have the same organizational change ramifications as the previous point.

Of course, there are other methods for addressing major software gaps. The BerryDunn team brings experience in facilitating discussions with agencies and their vendors to discuss gaps, their root causes, and possible solutions. We leverage a combination of project management discipline, organizational change management qualifications, and deep expertise to help clients increase the success likelihood for COTS software implementations—while maintaining their vital relationships with vendors.

Article
Grappling with software gaps