Planning for a successful enterprise technology project

05.08.23

Read this if your organization is planning on upgrading or replacing an enterprise technology system.

It can be challenging and stressful to plan for technology initiatives, especially those that involve and impact every area of your organization. Common initiatives include software upgrades or replacements for:

  • Financial management, such as Enterprise Resource Planning (ERP) systems
  • Asset management systems
  • Electronic health records (EHR) systems
  • Permitting and inspections systems

Though the number of considerations when planning enterprise technology projects can be daunting, the greatest mistake you can make is not planning at all. By addressing just a few key areas, you can avoid some of the most common pitfalls, such as exceeding budget and schedule targets, experiencing scope creep, and losing buy-in among stakeholders. Here are some tips to help you navigate your next project:

Identify your IT project roles and resources

While most organizations understand the importance of identifying project stakeholder groups, it is often an afterthought. Defining these roles at the outset of your project helps you accurately estimate the work effort.

Your stakeholder groups may include:

  • An executive sponsor
  • A steering committee
  • A project manager
  • Functional leads
  • A technical team

Once you’ve established the necessary roles, you can begin reviewing your organization’s resources to determine the people who will be available to fill them. Planning for resource availability will help you avoid delays, minimize impact to regular business processes, and reduce the likelihood of burnout. But this plan won’t remain static—you can expect to make updates throughout the project.

Establish clear goals and objectives to keep your technology project on track

It’s important that an enterprise technology project has established goals and objectives statements. These statements will help inform decision-making, provide benchmarks for progress, and measure your project’s success. They can then be referenced when key stakeholders have differing perspectives on the direction to take with a pending decision. For example, if the objective of your project is to reduce paper-based processes, you may plan for additional computer workstations and focus technical resources on provisioning them. You’ll also be able to measure your success in the reduction of paper-based tasks.

Estimate your IT project budget accurately

Project funding is hardly ever overlooked, but can be complex with project budgets that are either underestimated or estimated without sufficient rationale to withstand approval processes and subsequent budget analysis. You may find that breaking down estimates to a lower level of detail helps address these challenges. Most technology projects incur costs in three key areas:

  • Vendor cost: This could include both one-time software implementation costs as well as recurring costs for maintenance and ongoing support.
  • Infrastructure cost: Consider the cost of any investments needed to support your project, such as data center hardware, networking components, or computing devices.
  • Supplemental resource cost: Don’t forget to include the cost of any additional resources needed for their specialized knowledge or to simply backfill project staff. This could include contracted resources or the additional cost of existing resources (i.e., overtime).

A good technology project budget also includes a contingency amount. This amount will depend on your organization’s standards, the relative level of confidence in your estimates, and the relative risk.

Anticipate the need for change management

Depending on the project, staff in many areas of your organization will be impacted by some level of change during a technology implementation. External stakeholders, such as vendors and the public, may also be affected. You can effectively manage this change by proactively identifying areas of likely change resistance and creating strategies to address them.

In any technology implementation, you will encounter change resistance you did not predict. Having strategies in place will help you react quickly and effectively. Some proven change management strategies include communicating throughout your project, involving stakeholders to get their buy-in, and helping ensure management has the right amount of information to share with their employees.

Maintain focus and stay flexible as you manage your IT project

Even with the most thought-out planning, unforeseen events and external factors may impact your technology project. Establish mechanisms to regularly and proactively monitor project status so that you can address material risks and issues before their impact to the project grows. Reacting to these items as they arise requires key project stakeholders to be flexible. Key stakeholders must recognize that new information does not necessarily mean previous decisions were made in error, and that it is better to adapt than to stick to the initial direction.

Whether you’re implementing an ERP, an EHR, or enterprise human resources or asset management systems, any enterprise technology project is a massive undertaking, involving significant investment and a coordinated effort with individuals across multiple areas of an organization. Common mistakes can be costly, but having a structured approach to your planning can help avoid pitfalls. Our experienced, objective advisors have worked with public and private organizations across the country to oversee large enterprise projects from inception to successful completion.

Contact our software consulting team with any questions.

Related Professionals

Principals

BerryDunn experts and consultants

We’ve all heard stories about organizations spending thousands on software projects, such as Enterprise Resource Planning (ERP), Electronic Health Record (EHR), or Student Information Systems (SIS) that take longer than expected to implement and exceed original budgets. One of the reasons this occurs is that organizations often don’t realize that purchasing a large, Commercial Off-The-Shelf (COTS) enterprise system is a significant undertaking. If the needs aren’t sufficiently defined, there can be many roadblocks, including implementation delays, increased cost, scope creep, and ultimately, unsatisfactory results (delayed or unfinished projects and cost overruns).

These systems are complex, and implementation efforts impact both internal and external stakeholders. Procurement often requires participation from different departments, each with unique goals and perspectives. Ignore these perspectives at your own peril. Here are key questions to consider for making the best buying decision:

  1. Should we purchase software that similar organizations have purchased?
    As vendor consolidation has diminished the number of distinct COTS systems available, this question is increasingly common. Following this approach is similar to deciding to buy the car that your neighbor did, because they seem satisfied. How can you be sure that the systems purchased by similar organizations will meet your needs, particularly if your needs are undefined? One way to identify your organization’s needs—and to avoid costly mistakes down the road—is to identify requirements during the procurement process.

  2. What are the functional and technical requirements of the system?Requirements are details that help describe a software system. There are two types of requirements and you need to understand and review both:

    Functional requirements. These define specific functions of a system to meet day-to-day needs of an organization or department. They describe the necessary system capabilities that allow users to perform their jobs. For example, “The vendor file must provide a minimum of four (4) remit-to addresses.” Functional requirements may also define the mandated state or federal capabilities required of a system, such as the ability to produce W-2 or 1099 forms.

    Technical requirements. These requirements identify criteria used to judge the operation of a system, rather than specific behaviors. They can be requirements that define what database the system must support. For example, “The system must support use of the client preferred database.” They may also describe security capabilities of the system, the ability to import or export data, or the ease of use and overall end-user interface.

  3. Who should help define and document requirements for the new enterprise system?

    When it comes to documenting and revising requirements, work with your IT staff; incorporating technology standards into a set of requirements is a best practice. Yet it is also necessary to seek input from non-IT individuals, or business process owners from multiple departments, those who will use and/or be affected by the new software system.

    Help these individuals or groups understand the capabilities of modern software systems by having them visit the sites of other organizations, or attend software industry conferences. You should also have them document the current system’s deficiencies. As for those in your organization who want to keep the current system, encourage their buy-in by asking them to highlight the system’s most valuable capabilities. Perspectives from both new system supporters and those not so eager to change will help build the best system.
     
  4. When do you revise enterprise system requirements?
    It is always important to begin the software procurement process with a documented set of requirements; you need them to identify the best solution. The same goes for the implementation process where vendors use the requirements to guide the setup and configuration of the new system. But be prepared to revise and enhance requirements when a vendor solution offers an improved capability or a better method to achieve the results. The best way to approach it is to plan to revise requirements constantly. This enables the software to better meet current needs, and often delivers enhanced capabilities.

Be sure to document system requirements for an efficient process

There may be thousands of requirements for an enterprise system. To make the procurement process as efficient as possible, continually define and refine requirements. While this takes time and resources, there are clear benefits:

  • Having requirements defined in an RFP helps vendors match the capabilities of their software systems to your organization’s needs and functional expectations. Without requirements, the software procurement and selection process has little framework, and from a vendor perspective becomes a subjective process — making it hard to get consistent information from all vendors.
  • Requirements help determine specific tasks and activities to address during the implementation process. While applications can’t always meet 100% of the requested functionalities, it’s important to emphasize the requirements that are most important to users, to help find the system that best meets the needs of your organization.
  • Requirements prove valuable even after implementation has begun, as they can help you test your system to make sure the software meets your organization’s particular needs before production use of the new system.

Our experienced consultants have led many software procurement projects and have firsthand knowledge about the challenges and opportunities associated with purchasing and implementing systems large and small. BerryDunn maintains an active database of requirements that we continually enhance, based on work performed for various clients and on technological advancements in the marketplace. Please contact us and we can help you define your requirements for large software system purchases.

Article
Four questions to ask before purchasing an enterprise software system

There’s a good chance that your organization is in the position of needing to do more with less under the strain of staffing constraints and competing initiatives. With fewer resources to work with, you’ll need to be persuasive to get the green light on new enterprise technology initiatives. To do that, you need to present decision makers with well-thought-out and targeted business cases that show your initiative will have impact and will be successful. Yet developing such a business case is no walk in the park. Perhaps because our firm has its roots in New England, we sometimes compare this process to leading a hiking trip into the woods—into the wild. 

Just as in hiking, success in developing a business case for a new initiative boils down to planning, preparation, and applying a few key concepts we’ve learned from our travels. 

Consensus is critical when planning new technology initiatives

Before you can start the hike, everyone has to agree on some fundamentals: 

Who's going? 

Where are we going? 

When do we go and for how long? 

Getting everyone to agree requires clear communication and, yes, even a little salesmanship: “Trust me. The bears aren’t bad this time of year.” The same principle applies in proposing new technology initiatives; making sure everyone has bought into the basic framework of the initiative is critical to success.

Although many hiking trips involve groups of people similar in age, ability, and whereabouts, for your business initiative you need to communicate with diverse groups of colleagues at every level of the organization. Gaining consensus among people who bring a wide variety of skills and perspectives to the project can be complex.

To gain consensus, consider the intended audiences of your message and target the content to what will work for them. It should provide enough information for executive-level stakeholders to quickly understand the initiative and the path forward. It should give people responsible for implementation or who will provide specific skills substantive information to implement the plan. And remember: one of the most common reasons projects struggle to meet their stated objectives (and why some projects never materialize to begin with), is a lack of sponsorship and buy-in. The goal of a business case is to gain buy-in before project initiation, so your sponsors will actively support the project during implementation. 

Set clear goals for your enterprise technology project 

It’s refreshing to take the first steps, to feel that initial sense of freedom as you set off down the trail. Yet few people truly enjoy wandering around aimlessly in the wilderness for an extended period of time. Hikers need goals, like reaching a mountain peak or seeing famous landmarks, or hiking a predetermined number of miles per day. And having a trail guide is key in meeting those goals. 

For a new initiative, clearly define goals and objectives, as well as pain points your organization wishes to address. This is critical to ensuring that the project’s sponsors and implementation team are all on the same page. Identifying specific benefits of completing your initiative can help people keep their “eyes on the prize” when the project feels like an uphill climb.

Timelines provide additional detail and direction—and demonstrate to decision makers that you have considered multiple facets of the project, including any constraints, resource limitations, or scheduling conflicts. Identifying best practices to incorporate throughout the initiative enhances the value of a business case proposition, and positions the organization for success. By leveraging lessons learned on previous projects, and planning for and mitigating risk, the organization will begin to clear the path for a successful endeavor. 

Don’t compromise on the right equipment

Hiking can be an expensive, time-consuming hobby. While the quality of your equipment and the accuracy of your maps are crucial, you can do things with limited resources if you’re careful. Taking the time to research and purchase the right equipment, (like the right hiking boots), keeps your fun expedition from becoming a tortuous slog. 

Similarly, in developing a business case for a new initiative, you need to make sure that you identify the right resources in the right areas. We all live with resource constraints of one sort or another. The process of identifying resources, particularly for funding and staffing the project, will lead to fewer surprises down the path. As many government employees know all too well, it is better to be thorough in the budget planning process than to return to authorizing sources for additional funding while midstream in a project. 

Consider your possible outcomes

You cannot be too singularly focused in the wild; weather conditions change quickly, unexpected opportunities reveal themselves, and being able to adapt quickly is absolutely necessary in order for everyone to come home safely. Sometimes, you should take the trail less traveled, rest in the random lean-to that you and your group stumble upon, or go for a refreshing dip in a lake. By focusing on more than just one single objective, it often leads to more enjoyable, safe, and successful excursions.

This type of outlook is necessary to build a business case for a new initiative. You may need to step back during your initial planning and consider the full impact of the process, including on those outside your organization. For example, you may begin to identify ways in which the initiative could benefit both internal and external stakeholders, and plan to move forward in a slightly new direction. Let’s say you’re building a business case for a new land management and permitting software system. Take time to consider that this system may benefit citizens, contractors, and other organizations that interact with your department. This new perspective can help you strengthen your business case. 

Expect teamwork

A group that doesn’t practice teamwork won’t last long in the wild. In order to facilitate and promote teamwork, it’s important to recognize the skills and contributions of each and every person. Some have a better sense of direction, while some can more easily start campfires. And if you find yourself fortunate enough to be joined by a truly experienced hiker, make sure that you listen to what they have to say.

Doing the hard work to present a business case for a new initiative may feel like a solitary action at times, but it’s not. Most likely, there are other people in your organization who see the value in the initiative. Recognize and utilize their skills in your planning. We also suggest working with an experienced advisor who can leverage best practices and lessons learned from similar projects. Their experience will help you anticipate potential resistance and develop and articulate the mitigation strategies necessary to gain support for your initiative.

If you have thoughts, concerns, or questions, contact our team. We love to discuss the potential and pitfalls of new initiatives, and can help prepare you to head out into the wild. We’d love to hear any parallels with hiking and wilderness adventuring that you have as well. Let us know! 

BerryDunn’s local government consulting team has the experience to lead technology planning initiatives and develop actionable plans that help you think strategically and improve service delivery. We partner with you, maintaining flexibility and open lines of communication to help ensure that your team has the resources it needs.

Our team has broad and deep experience partnering with local government clients across the country to modernize technology-based business transformation projects and the decision-making and planning efforts. Our expertise includes software system assessments/planning/procurement and implementation project management; operational, management, and staffing assessments; information security; cost allocation studies; and data management.  

Article
Into the wild: Building a business case for a new enterprise technology project

Federal contractors with the Centers for Medicare & Medicaid Services (CMS) have begun performing Payment Error Rate Measurement (PERM) reviews under the Final Rule issued in July 2017—a rule that many states may not realize could negatively impact their Medicaid budgets.

PERM is a complex process—states must focus on several activities over a recurring three-year period of time—and states may not have the resources needed to make PERM requirements a priority. However, with the Final Rule, this PERM eligibility review could have financial implications. 

After freezing the eligibility measurement for four years while undergoing pilot review, CMS has established new requirements for the eligibility review component and made significant changes to the data processing and medical record review components. As part of the Final Rule, CMS may implement reductions in the amount of federal funding provided to a state’s Medicaid and Children’s Health Insurance Program (CHIP) programs based on the error rates identified from the eligibility reviews. 

Since the issuance of the Final Rule in July 2017, Cycle 1 states are the first group of states to undergo a PERM cycle, including reviews of the data processing, medical record, and eligibility components. These states are wrapping up the final review activities, and Cycle 2 states are in the early stages of their PERM reviews.

How can your state prepare?

Whether your state is a Cycle 1, Cycle 2, or Cycle 3 state, there are multiple activities your Medicaid departments should engage in throughout each three-year period of time during and between PERM cycles: 

  • Analyzing prior errors cited or known issues, along with the root cause of the error
  • Identifying remedies to reduce future errors
  • Preparing and submitting required questionnaires and documents to the federal contractors for an upcoming review cycle
  • Assisting federal contractors with current reviews and findings
  • Preparing for and undergoing Medicaid Eligibility Quality Control (MEQC) planning and required reviews
  • Corrective action planning

Is your state ready?

We’ve compiled a few basic questions to gauge your state’s readiness for the PERM review cycle:

  • Do you have measures in place to ensure all eligibility factors under review are identifiable and that all federal and state regulations are being met? The eligibility review contractor (ERC) will reestablish eligibility for all beneficiaries sampled for review. This process involves confirming all verification requirements are in the case file, income requirements are met, placement in an accurate eligibility category has taken place, and the timeframe for processing all determinations meets federal and state regulations. 
  • Do you have up-to-date policy and procedures in place for determining and processing Medicaid or CHIP eligibility of an individual? Ensuring eligibility policies and procedures meet federal requirements is just as important as ensuring the processing of applications, including both system and manual actions, meet the regulations. 
  • Do you have up-to-date policy, procedures, and system requirements in place to ensure accurate processing of all Medicaid/CHIP claims? Reviewers will confirm the accuracy of all claim payments based on state and federal regulations. Errors are often cited due to the claims processing system allowing claims to pay that do not meet regulations.
  • Do you have a dedicated team in place to address all PERM requirements to ensure a successful review cycle? This includes staff to answer questions, address review findings, and respond to requests for additional information. During a review cycle, the federal contractors will cite errors based on their best understanding of policies and/or ability to locate required documentation. Responding to requests for information or reviewing and responding to findings in a timely manner should be a priority to ensure accurate findings. 
  • Have you communicated all PERM requirements and updates to policy changes to all Medicaid/CHIP providers? Providers play two integral roles in the success of a PERM review cycle. Providers must understand all claims submission requirements in order to accurately submit claims. Additionally, the medical record review component relies on providers responding to the request for the medical records on a sampled claim. Failure to respond will result in an error. Therefore, states must maintain communication with providers to stress the importance of responding to these requests.
  • Have you begun planning for the MEQC requirement? Following basic requirements identified by CMS during your state’s MEQC period, your state must submit a case planning document to CMS for approval prior to the MEQC review period. After the MEQC review, your state should be prepared to issue findings reports, including a corrective action plan as it relates to MEQC findings.

Need help piloting your state’s PERM review process?

BerryDunn has subject matter experts experienced in conducting PERM reviews, including a thorough understanding of all three PERM review components—eligibility, data processing, and medical record reviews. 

We would love to work with your state to see that measures are in place that will help ensure the lowest possible improper payment error rate. Stay tuned for upcoming blogs where we will discuss other PERM topics, including MEQC requirements, the financial impacts of PERM, and additional details related to each phase of PERM. For questions or to find out more, please email me
 

Article
PERM: Prepared or not prepared?

Focus on the people: How higher ed institutions can successfully make an ERP system change

The enterprise resource planning (ERP) system is the heart of an institution’s business, maintaining all aspects of day-to-day operations, from student registration to staff payroll. Many institutions have used the same ERP systems for decades and face challenges to meet the changing demands of staff and students. As new ERP vendors enter the marketplace with new features and functionality, institutions are considering a change. Some things to consider:

  1. Don’t just focus on the technology and make change management an afterthought. Transitioning to a new ERP system takes considerable effort, and has the potential to go horribly wrong if sponsorship, good planning, and communication channels are not in place. The new technology is the easy part of a transition—the primary challenge is often rooted in people’s natural resistance to change.  
  2. Overcoming resistance to change requires a thoughtful and intentional approach that focuses on change at the individual level. Understanding this helps leadership focus their attention and energy to best raise awareness and desire for the change.
  3. One effective tool that provides a good framework for successful change is the Prosci ADKAR® model. This framework has five distinct phases that align with ERP change:

These phases provide an approach for developing activities for change management, preparing leadership to lead and sponsor change and supporting employees through the implementation of the change.

The three essential steps to leveraging this framework:

  1. Perform a baseline assessment to establish an understanding of how ready the organization is for an ERP change
  2. Provide sponsorship, training, and communication to drive employee adoption
  3. Prepare and support activities to implement, celebrate, and sustain participation throughout the ERP transition

Following this approach with a change management framework such as the Prosci ADKAR® model can help an organization prepare, guide, and adopt ERP change more easily and successfully. 

If you’re considering a change, but need to prepare your institution for a healthy ERP transition using change management, chart yourself on this ADKAR framework—what is your organization’s change readiness? Do you have appropriate buy-in? What problems will you face?

You now know that this framework can help your changes stick, and have an idea of where you might face resistance. We’re certified Prosci ADKAR® practitioners and have experience guiding Higher Ed leaders like you through these steps. Get in touch—we’re happy to help and have the experience and training to back it up. Please contact the team with any questions you may have.

1Prosci ADKAR®from http://www.prosci.com

Article
Perspectives of an Ex-CIO

Law enforcement, courts, prosecutors, and corrections personnel provide many complex, seemingly limitless services. Seemingly is the key word here, for in reality these personnel provide a set number of incredibly important services.

Therefore, it should surprise no one that justice and public safety (J&PS) IT departments should also provide a well-defined set of services. However, these departments are often viewed as parking lots for all technical problems. The disconnect between IT and other J&PS business units often stems from differences in organizational culture and structure, and differing department objectives and goals. As a result, J&PS organizations often experience misperception between business units and IT. The solution to this disconnect and misperception? Defining IT department services.

The benefits of defined IT services

  1. Increased business customer satisfaction. Once IT services align with customer needs, and expectations are established (e.g., service costs and service level agreements), customers can expect to receive the services they agreed to, and the IT department can align staff and skill levels to successfully meet those needs.
  2. Improved IT personnel morale. With clear definition of the services they provide to their customers, including clearly defined processes for customers to request those services, IT personnel will no longer be subject to “rogue” questions or requests, and customers won’t be inclined to circumvent the process. This decreases IT staff stress and enables them to focus on their roles in providing the defined services. 
  3. Better alignment of IT services to organizational needs. Through collaboration between the business and IT organizations, the business is able to clearly articulate the IT services that are, and aren’t, required. IT can help define realistic service levels and associated services costs, and can align IT staff and skills to the agreed-upon services. This results in increased IT effectiveness and reduced confusion regarding what services the business can expect from IT.
  4. More collaboration between IT and the organization. The collaboration between the IT and business units in defining services results in an enhanced relationship between these organizations, increasing trust and clarifying expectations. This collaborative model continues as the services required by the business evolve, and IT evolves to support them.
  5. Reduced costs. J&PS organizations that fail to strategically align IT and business strategy face increasing financial costs, as the organization is unable to invest IT dollars wisely. When a business doesn’t see IT as an enabler of business strategy, IT is no longer the provider of choice—and ultimately risks IT services being outsourced to a third-party vendor.

Next steps
Once a J&PS IT department defines its services to support business needs, it then can align the IT staffing model (i.e., numbers of staff, skill sets, roles and responsibilities), and continue to collaborate with the business to identify evolving services, as well as remove services that are no longer relevant. Contact us for help with this next step and other IT strategies and tactics for justice and public safety organizations.

Article
The definition of success: J&PS IT departments must define services

If you’ve been tasked with leading a high-impact project for your organization, you may find managing the scope, budget and schedule is not enough to ensure project success—especially when you encounter resistance to change. When embarking on large-scale change projects spanning people, processes and technology, appointing staff as “coaches” to help support stakeholders through the change—and to manage resistance to the change—can help increase adoption and buy-in for a new way of doing things.

The first step is to identify candidates for the coaching role. These candidates are often supervisory staff who have credibility in the organization—whether as a subject matter expert, through internal leadership, or from having a history of client satisfaction. Next, you need a work plan to orient them to this role. One critical component is making sure the coaches themselves understand what the change means for their role, and have fully committed before asking them to coach others. They may exhibit initial resistance to the change you will need to manage before they can be effective coaches. According to research done by Prosci®, a leading change management research organization, some of the most common reasons for supervisor resistance in large-scale change projects are:

  • Lack of awareness about and involvement in the change
  • Loss of control or negative impact on job role
  • Increased work load (i.e., lack of time)
  • Culture of change resistance and past failures
  • Impact to their team

You should anticipate encountering these and other types of resistance from staff while preparing them to be coaches. Once coaches buy into the change, they will need ongoing support and guidance to fulfill their role. This support will vary by individual, but may be correlated to what managerial skills they already possess, or don’t. How can you focus on developing coaching skills among your staff for purposes of the project? Prosci® recommends a successful change coach take on the following roles:

  • Communicator—communicate with direct reports about the change
  • Liaison—engage and liaise with the project team
  • Advocate—advocate and champion the change
  • Resistance manager—identify and manage resistance
  • Coach—coach employees through the change

One of the initial tasks for your coaches will be to assess the existing level of change resistance and evaluate what resistance you may encounter. Prosci® identifies three types of resistance management work for your coaches to begin engaging in as they meet with their employees about the change:

  • Resistance prevention―by providing engagement opportunities for stakeholders throughout the project, building awareness about the change early on, and reinforcing executive-level support, coaches can often head off expected resistance.
  • Proactive resistance management―this approach requires coaches to anticipate the needs and understand the characteristics of their staff, and assess how they might react to change in light of these attributes. Coaches can then plan for likely forms of resistance in advance, with a structured mitigation approach.
  • Reactive resistance management―this focuses on resistance that has not been mitigated with the previous two types of resistance management, but instead persists or endures for an extended amount of time. This type of management may require more analysis and planning, particularly as the project nears its completion date.

Do you have candidates in your organization who may need support transitioning into coaching roles? Do you anticipate change resistance among your stakeholders? Contact us and we can help you develop a plan to address your specific challenges.

Article
How to identify and prepare change management coaches

While new software applications help you speed up processes and operations, deciding which ones will work best for your organization can quickly evolve into analysis paralysis, as there are so many considerations.

Case in point: Software as a Service (SaaS) model
The benefits of the SaaS model, in which a vendor remotely hosts an organization’s applications, are fairly well known: your organization doesn’t have to shell out for costly hardware, the vendor tackles upgrades, backups, data recovery, and security, and you have more time and money to focus on your business goals.

There are multiple factors to look at when determining whether a SaaS solution is right for you. We’ve compiled a list of the top three SaaS considerations:

1. Infrastructure and capacity
Your organization should consider your own people, processes, and tools when determining whether SaaS makes sense. While an on-site solution may require purchasing new technologies, hiring new staff, and realigning current roles and responsibilities to maintain the system, maintaining a SaaS solution may also require infrastructure updates, such as increased bandwidth to sufficiently connect to the vendor's hosting site.

Needless to say, it’s one thing to maintain a solution; it’s an entirely different thing to keep it secure. An on-site hosting solution requires constant security upgrades, internal audits, and a backup system—all of which takes time and money. A SaaS model requires trust in your vendor to provide security. Make sure your potential vendor uses the latest security measures and standards to keep your critical business data safe and secure.

2. Expense
When you purchase major assets—for example, hardware to host its applications—it incurs capital expenses. Conversely, when you spend money on day-to-day operations (SaaS subscriptions), it incurs operating expenses.

You should weigh the pros and cons of each type of expense when considering a SaaS model. On-site upfront capital expenses for hosting hardware are generally high, and expenses can spike overtime when you update the technology, which can be difficult to predict. And don’t forget about ongoing costs for maintenance, software upgrades, and security patches.

In the SaaS model, you spread out operating costs over time and can predict costs because you are paying via subscription—which generally includes costs for maintenance, software upgrades, and security patches. However, remember you can depreciate capital expenses over time, whereas the deductibility of operating expenses are generally for the year you use them.

3. Vendor viability
Finally, you need to conduct due diligence and vet SaaS vendors before closing the deal. Because SaaS vendors assume the responsibility for vital processes, such as data recovery and security, you need to make sure the potential vendor is financially stable and has a sustainable business model. To help ensure you receive the best possible service, select a vendor considered a leader in its market sector. Prepare a viable exit strategy beforehand so you can migrate your business processes and data easily in case you have any issues with the SaaS provider.

You must read—and understand—the fine print. This is especially important when it comes to the vendor’s policies toward data ownership and future migrations to other service providers, should that become necessary. In other words: Make sure you have final say and control over your data.

Every organization has different aspects of their situation to consider when making a SaaS determination. Want to learn more? It’s a snap! Contact the authors: Clark Lathrum and Matthew Tremblay

Article
SaaS: Is it right for you? Making SaaS determinations a snap.

Most of us have been (or should have been) instructed to avoid using clichés in our writing. These overstated phrases and expressions add little value, and often only increase sentence length. We should also avoid clichés in our thinking, for what we think can often influence how we act.

Consider, for example, “death by committee.” This cliché has greatly — and negatively — skewed views on the benefits of committees in managing projects. Sure, sometimes committee members have difficulty agreeing with one another, which can lead to delays and other issues. In most cases, though, an individual can’t possibly oversee all aspects of a project, or represent all interests in an organization. Committees are vital for project success — and arguably the most important project committee is the steering committee.

What Exactly is a Steering Committee?
It is a group of high-level stakeholders that provides strategic direction for a project, and supports the project manager. Ideally, the group increases the chances for project success by closely aligning project goals to organizational goals. However, it is important to point out that the group’s top priority is project success.

The committee should represent the different departments and agencies affected by the project, but remain relatively small in size, chaired by someone who is not an executive sponsor of the project (in order to avoid conflicts of interest). While the project manager should serve on the steering committee, they should not participate in decision-making; the project manager’s role is to update members on the project’s progress, areas of concern, current issues, and options for addressing these issues.

Overall, the main responsibilities of a steering committee include:

  1. Approving the Project Charter
  2. Resolving conflicts between stakeholder groups
  3. Monitoring project progress against the project management plan
  4. Fostering positive communicating about the project within the organization
  5. Addressing external threats and issues emerging outside of the project that could impact it
  6. Reviewing and approving changes made to the project resource plan, scope, schedules, cost estimates, etc.

What Are the Pros and Cons of Utilizing a Steering Committee?
A group of executive stakeholders providing strategic direction should benefit any project. Because steering committee members are organizational decision-makers, they have the access and credibility to address tough issues that can put the project at a risk, and have the best opportunities to negotiate positive outcomes. In addition, steering committees can engage executive management, and make sure the project meshes with executive management’s vision, mission, and long-range strategic plan. Steering committees can empower project managers, and ensure that all departments and agencies are on the same page in regards to project status, goals, and expectations. In a 2009 article in Project Management Journal, authors Thomas G. Lechler and Martin Cohen concluded that steering committees are important to implementing and maintaining project management standards on an operational level — not only do steering committees directly support project success, they are instrumental in deriving value from an organization's investments in its project management system.

A steering committee is only as effective as it’s allowed to be. A poorly structured steering committee that lacks formal authority, clear roles, and clear responsibilities can impede the success of a project by being slow to respond to project issues. A proactive project manager can help the organization avoid this major pitfall by helping develop project documents, such as the governance document or project plan that clearly define the steering committee structure, roles, responsibilities and authority.

Steer Toward Success!
Steering committees can benefit your organization and its major projects. Yet understanding the roles and responsibilities — and pros and cons — is only a preliminary step in creating a steering committee. Need some advice on how to organize a steering committee? Want to learn more about steering committee best practices? Together, we can steer your project toward success.

Article
Success by steering committee